{"id":42029,"date":"2006-06-27T20:10:56","date_gmt":"2006-06-27T12:10:56","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/waiver-issued-in-event-of-eco-sensor-failure\/"},"modified":"2006-06-27T20:10:56","modified_gmt":"2006-06-27T12:10:56","slug":"waiver-issued-in-event-of-eco-sensor-failure","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/waiver-issued-in-event-of-eco-sensor-failure\/","title":{"rendered":"Waiver issued in event of ECO sensor failure"},"content":{"rendered":"<p>NASA has issued a Launch Commit Criteria (LCC) waiver in case of a specific ECO (Engine Cut Off) sensor failure, with a troubleshooting plan drawn up in case of related problems in the countdown.  <\/p>\n<p>  Despite some documented disagreement on the correct way to deal with sensor failures \u2013 with some element within NASA recommending a full \u201c4 of 4\u201d LCC should remain \u2013 it is hoped the waiver won\u2019t be required during the final preparations for the launch of STS-121.<br \/>\n<font face=\"Arial\" size=\"2\"><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"88\" alt=\"\" hspace=\"5\" src=\"http:\/\/logo.cafepress.com\/3\/4811501.1268853.jpg\" data-rel=\"penci-gallery-image-content\" width=\"150\" align=\"left\" vspace=\"5\" border=\"0\"><\/font>NASA meetings had previously dismissed a change in the LCC for the sensors, added to the 5th of April decision against a tanking test to&nbsp;evaluate the ECO sensors for any potential repeat of failures recorded in the run up to STS-114 last July, with faults showing during both the tanking test and the first countdown \u2013 the latter causing a scrub. <\/font>  <\/p>\n<p><font face=\"Arial\" size=\"2\">This followed a decision to swap out the LH2 ECO sensors from ET-119 \u2013 a process that is also currently being undertaken on ET-118 at KSC \u2013 due to information that pointed at a large amount of installed sensors coming from a bad batch. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The ECO R&amp;R work may have ultimately solved the problem, which would allow for the launch of Discovery to proceed without the ECO sensors hindering the countdown. However, if a fault does show, NASA has a plan. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The waiver is based around a single LH2 ECO sensor failing \u2018wet\u2019 during the countdown, a series of SIM commands will test the system, with the waiver noting certain criteria that will determine whether the launch can proceed as planned, or scrubbed.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=7015\" width=\"468\" vspace=\"5\" border=\"0\"><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">However, if a \u2018single DRY failure or multiple WET or DRY failures,\u2019 then the launch would become a \u2018scrub, stand down, form teams, do not attempt 24 or 48 hour turnaround,\u2019 noted an attached Space Shuttle Systems Engineering and Integration Office (SE&amp;I) document. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018SICB (NASA\u2019s System Integration Control Board) consensus that additional troubleshooting on pad unlikely to identify cause of failure.\u2019 <\/p>\n<p>\u2018On second launch attempt, if same sensor fails wet or there is no ECO failure: Go for Launch,\u2019 \u2013 with the \u2013 \u2018LCC exception rationale: Confidence increased in remaining 3 sensor system, PRA for LOCV (Loss of Crew\/Vehicle) with one failed ECO sensor system \u2013 cause unknown \u2013 is better than 1\/1000. Any other failure signature (different sensor, multiple sensors fail): SCRUB. Assess intrusive troubleshooting.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"208\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=7014\" width=\"224\" align=\"left\" vspace=\"5\" border=\"0\">The waiver notes \u2013 in justification: \u2018Additional time and cryo cycles provide confidence in the remaining ECO System. 3 of 4 systems is acceptable for flight and meets the fail ops\/fail safe criteria. The likelihood of two additional ECO System Failed WET coupled with a need for the LLCO system during flight is considered remote. (Greater than 1 in 1000).\u2019<\/p>\n<p>SE&amp;I\u2019s document also noted that STS-114\u2019s ECO issues are still classed as an UA (Unknown Anomaly), although technicians believe they have a theory as to what caused the ECO sensor problem. <\/font><\/p>\n<p>  Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Exact root cause of failure on the day of launch will not be known, may just be narrowed to a given area of the circuit, E.g., most probable cause of STS-114 launch attempt anomaly is a cryogenic tanking induced, high impedance\/open in measurement path. Unable to narrow down to PSB, Orbiter wiring, Orbiter connectors, ET wiring, ET connectors, or ET sensor.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Presenting rationale against the \u20183 of 4\u2019 position was Johnson Space Center\u2019s \u2018EP4\u2019, noting in their JSC\/EP4 MPS Integration position: \u2018We advocate a 4 of 4 LCC for LH2 ECO sensors because of the MX\/NC PRA. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018The PRA says that if we launch 3 of 4 with an unidentified root cause then the probability of LOCV is approximately 10 (to the power) 3. If we launch 4 of 4 or 3 of 4 with the failure identified so that common cause can be ruled out, then the probability is in the 10 (to the power) 6 range. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Any STS-121 on-pad troubleshooting plan that does not culminate in identification of the failure mode does not help the probability issue. Therefore, not in favor of any 24-48 hr scrub turnaround tankings.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018(There is) new data supporting 4-of-4 position. Thermal conditioning does not improve the future reliability of the sensor (per May 4 PRCB tanking test PSE&amp;I charts). ET Project has reported that problematic swages can cause inconsistent and unrepeatable resistance changes from cryocycle to cryocycle.\u2019<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=7016\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\"><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/p>\n<p>As far as getting to the point in the count where a most of these decisions will kick in, most of the documentation shows that a final assessment of any issue that arises will come at T-9 minutes. What is also clear in JSC\/EP4 MPS Integration\u2019s position is the requirement for a rollback of Discovery \u2013 and detank (ending the July launch window opportunity) should the failure breach the troubleshooting criteria. <\/p>\n<p>\u2018MPS NSE recommends \u2018Go\u2019 for launch ONLY if fail \u2018wet\u2019 condition occurs and is positively isolated to the MDM after reaching stable replenish (ensures thermal equilibrium of all system elements including monoball). <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Otherwise: \u2018Review of other signals going through the affected mono-ball for anomalous signatures. Review of other subsystem activities coinciding with the ECO anomaly event for possible EMI influence. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"99\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=5373\" width=\"144\" align=\"right\" vspace=\"5\" border=\"0\"><\/font>\u2018Detank. Open aft compartment and install break out box at monoball production break (connectors 50J952 or 50J963). Perform resistance and TDR reading on affected circuit plus equivalent circuit. Remove break out box and install cryosimulator at new production break. Perform point sensor box system level checkout. Detailed data review of all of the above. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Go for second launch attempt if troubleshooting isolates\/corrects failure and no common cause concerns exist. If troubleshooting does not identify\/isolate failure and allow for ruling out common cause, EP4 MPS integration is \u2018No Go\u2019 for subsequent launch attempt.\u2019<\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**NASASpaceflight.com Job Opportunities**<\/font><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.lduhtrp.net\/image-1911168-10415279\" width=\"120\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/font><em><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"10\" src=\"http:\/\/www.awltovhc.com\/image-1911168-10419894\" width=\"120\" align=\"right\" vspace=\"10\" border=\"0\"><\/font><\/em><br \/><font face=\"Arial\" size=\"2\"><em>&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/em><\/font><u><font face=\"Arial\" size=\"2\"><em>LIVE&nbsp;UPDATE PAGES<\/em><\/font><\/p>\n<p><\/u><\/p>\n<p><font face=\"Courier New\"><font face=\"Courier New\"><font face=\"Courier New\"><\/font><\/font><\/font><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA has issued a Launch Commit Criteria (LCC) waiver in case of a specific ECO (Engine Cut Off) sensor failure, with a troubleshooting plan drawn up in case of related problems in the countdown. Despite some documented disagreement on the correct way to deal with sensor failures \u2013 with some element within NASA recommending a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-42029","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42029"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=42029"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42029\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=42029"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=42029"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=42029"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}