{"id":42046,"date":"2006-06-10T22:54:39","date_gmt":"2006-06-10T14:54:39","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/et-118-heads-into-its-critical-flow\/"},"modified":"2006-06-10T22:54:39","modified_gmt":"2006-06-10T14:54:39","slug":"et-118-heads-into-its-critical-flow","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/et-118-heads-into-its-critical-flow\/","title":{"rendered":"ET-118 heads into its critical flow"},"content":{"rendered":"<p>Having arrived at the Kennedy Space Center (KSC) on Friday, External Tank ET-118\u2019s ECO (Engine Cut Off) sensor change-out timetable has been set.  <\/p>\n<p>  A smooth processing flow is required to ensure the tank remains within the timeline for the scheduled launch of Atlantis on STS-115 \u2013 and the standby STS-300 requirement in support of STS-121.\n<\/p>\n<p><font face=\"Arial\" size=\"2\"><font color=\"#ff0000\"><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"90\" alt=\"\" hspace=\"5\" src=\"http:\/\/content.nasaspaceflight.com\/library\/1016\/logo2_1bk.jpg\" data-rel=\"penci-gallery-image-content\" width=\"182\" align=\"right\" vspace=\"5\" border=\"0\"><\/em><\/font><font face=\"Arial\"><em><font size=\"2\">L2, for&nbsp;expanded documents and information covering the&nbsp;space programs at work. To join L2, click the advert \u2014&gt;<\/p>\n<p><font color=\"#0000ff\">**LIVE ATLANTIS STS-115 UPDATES**<\/font><br \/><\/font><\/em><\/font><\/font><br \/>Under normal circumstances, an External Tank (ET) would arrive at KSC, before being moved into a checkout\/intergration cell in the Vehicle Assembly Building (VAB) for leak checks and other various testing proceedures \u2013 prior to being lifted from the transfer aisle for mating with its twin solid rocket boosters. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"88\" alt=\"\" hspace=\"5\" src=\"http:\/\/logo.cafepress.com\/3\/4811501.1268853.jpg\" width=\"150\" align=\"left\" vspace=\"5\" border=\"0\"><\/font>Due to the requirement for the LH2 ECO sensors to be swapped out, ET-118 will recieve the same convoluted proceedure ET-119 underwent upon its arrival at KSC. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">United Space Alliance and Lockheed workers had evaluated the possibility of speeding up the process by conducting all the work in the vertical position, however new information \u2013 via a processing document date June 8 \u2013 shows that this appears to have been dismissed as unviable. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The document does confirm that Lockheed workers at the Michould Assembly Facility (MAF) are to head to KSC to help with the work that will involve USA technicians and engineers. \u2018MAF crew being deployed to support tank processing at KSC. <\/font><\/p>\n<p><font face=\"Arial\"><font size=\"2\">\u2018MAF team staged to support ET-118 processing at KSC. ET DCR Preboard and Board complete, closure of open work in progress to support required milestones.\u2019 <\/p>\n<p><\/font><font size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"128\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=4983\" width=\"130\" align=\"left\" vspace=\"5\" border=\"0\"><\/font><em><font color=\"#ff0000\"><font face=\"Arial\" size=\"2\">STS-121 Mission T-Shirt. Use discount code \u2018nasaspaceflight\u2019 when&nbsp;ordering from Countdown Creations &amp; receive 5% off!<\/p>\n<p><\/font><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"99\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=5373\" width=\"144\" align=\"right\" vspace=\"5\" border=\"0\"><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">NASASPACEFLIGHT.COM RSS FEED&nbsp;\u2014&gt;<br \/><\/font><\/font><\/em><\/p>\n<p><font size=\"2\">A number of days worth of preparation work is required before the ECO sensor R&amp;R can begin, including LH\/LO 17\u2032 disconnect measure\/adjust, the venting and purging of the tank and the building of a the clean room tent and scaffolding around the aft of the tank. <\/font><\/font><font face=\"Arial\" size=\"2\"><em>**ET 119 ECO R&amp;R Article**&nbsp;<\/em><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">On June 20, workers will chip away at the foam around the aft doom access hatch to allow technicians to enter the tank. <\/p>\n<p>Following the replacement and leak tests, it is hoped the tank will be ready to be placed in the horizontal position for TPS repair (foam replacement) to the aft of the tank with BX-265 foam. <\/font><\/p>\n<p>  NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\">Loading into the intergration cell is scheduled for July 11.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Meanwhile, at MAF, ET-123 is now classed as on schedule in its processing flow, following a review to mitigate delays to the third tank to arrive at KSC this year.<\/p>\n<p><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.lduhtrp.net\/image-1911168-10415279\" width=\"120\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/font><em><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"10\" src=\"http:\/\/www.awltovhc.com\/image-1911168-10419894\" width=\"120\" align=\"right\" vspace=\"10\" border=\"0\"><\/font><\/em><br \/><font face=\"Arial\" size=\"2\"><em>&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/em><\/font><u><font face=\"Arial\" size=\"2\"><em>LIVE&nbsp;UPDATE PAGES<\/em><\/font><\/p>\n<p><\/u><\/font><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Having arrived at the Kennedy Space Center (KSC) on Friday, External Tank ET-118\u2019s ECO (Engine Cut Off) sensor change-out timetable has been set. A smooth processing flow is required to ensure the tank remains within the timeline for the scheduled launch of Atlantis on STS-115 \u2013 and the standby STS-300 requirement in support of STS-121. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-42046","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42046"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=42046"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42046\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=42046"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=42046"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=42046"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}