{"id":42048,"date":"2006-06-06T19:51:04","date_gmt":"2006-06-06T11:51:04","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/crucial-et-design-certification-review-passed\/"},"modified":"2006-06-06T19:51:04","modified_gmt":"2006-06-06T11:51:04","slug":"crucial-et-design-certification-review-passed","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/crucial-et-design-certification-review-passed\/","title":{"rendered":"Crucial ET Design Certification Review passed"},"content":{"rendered":"<p>NASA managers met on Wednesday to pour over the latest wind tunnel results, ahead of a crucial PRCB (Program Requirements Control Board) meeting on Thursday.  <\/p>\n<p>  A large number of documents have been collated as part of the External Tank Design Certification Review \u2013 which was a potential showstopper for Discovery\u2019s STS-121 mission, currently set to launch next month. The review was passed on Wednesday.\n<\/p>\n<p><font size=\"2\"><font color=\"#ff0000\"><font face=\"Arial\"><em><img loading=\"lazy\" decoding=\"async\" height=\"90\" alt=\"\" hspace=\"5\" src=\"http:\/\/content.nasaspaceflight.com\/library\/1016\/logo2_1bk.jpg\" data-rel=\"penci-gallery-image-content\" width=\"182\" align=\"right\" vspace=\"5\" border=\"0\"><\/em><\/font><font size=\"2\"><em><font face=\"Arial\">L2, for&nbsp;expanded documents and information covering the&nbsp;space programs at work. Live \u2018play by play\u2019 coverage, with background, updates and documents from&nbsp;the crucial reviews and meetings on L2.&nbsp;To join L2, click the advert \u2014&gt;<\/p>\n<p><\/font><\/em><font face=\"Arial\"><em>**L2 Live Play by Play updates**<\/em><\/font><\/p>\n<p><font face=\"Arial\"><em>**Open forum update thread**<\/em><\/font><font size=\"3\"><font face=\"Arial\"><em><font size=\"2\">&nbsp;(Result: Review passed)<\/p>\n<p><u><font color=\"#000000\">Background:<\/font><\/u><\/font><\/em><br \/><\/font><\/font><\/font><\/font><\/font><br \/><font face=\"Arial\" size=\"2\">Last week saw Shuttle managers negotiate one major hurdle with the passing of the Debris Verification Review (DVR), despite protests from the Marshall Space Flight Center (MSFC) who wanted further modifications made to the ice\/frost ramps on the External Tank (ET). <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"165\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=6024\" width=\"178\" align=\"left\" vspace=\"5\" border=\"0\">While the other major modification that has been made to the ETs \u2013 the removal of the PAL ramp \u2013 has also passed previous reviews, the certification process has now moved on to the affects the modifications will have on the aerodynamics of the tank\u2019s&nbsp;structure during ascent. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Early wind tunnel computer simulations showed some \u2018poke outs\u2019 on the changes seen with the aerodynamics around the tank at \u2018max Q\u2019 \u2013 the time the shuttle is under the stress of maximum dynamic pressure during the ride uphill, at the time of SRB (Solid Rocket Booster) separation and when encountering strong wind sheer. <\/p>\n<p>The reasons the modified tank is being scrutinised is to ensure that the cable tray, LOX feedline and pressure lines can handle the stresses of a launch without the protection of the now-removed PAL ramp. Early results have been positive, according to Shuttle manager Wayne Hale. <br \/><\/font><font face=\"Arial\" size=\"2\"><br \/><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"128\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=4983\" width=\"130\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/font><em><font color=\"#ff0000\"><font face=\"Arial\" size=\"2\">STS-121 Mission T-Shirt. Use discount code \u2018nasaspaceflight\u2019 when&nbsp;ordering from Countdown Creations &amp; receive 5% off!<\/p>\n<p><\/font><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"99\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=5373\" width=\"144\" align=\"right\" vspace=\"5\" border=\"0\"><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">NASASPACEFLIGHT.COM RSS FEED&nbsp;\u2014&gt;<br \/><\/font><\/font><\/em><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em><font color=\"#ff0000\"><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/font><\/em><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018We are going to the External Tank Design Certification Review, and at that time we will find out from the structural analysis whether all of the aerodynamic changes have resulted in a situation where the structure will still hold together,\u2019 said Hale. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Our preliminary (results) are good, but we are going to find out the final story on Wednesday at that review. <\/font><\/p>\n<p>  Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight history books<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Then on the 16\/17th of June will we have the Flight Readiness Review (FRR) as the final management review for the preparations of the flight STS-121.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"88\" alt=\"\" hspace=\"5\" src=\"http:\/\/logo.cafepress.com\/3\/4811501.1268853.jpg\" data-rel=\"penci-gallery-image-content\" width=\"150\" align=\"left\" vspace=\"5\" border=\"0\">Wednesday\u2019s review will help collate the agency wide presentations that will be presented to the PRCB on Thursday, at a meeting that will round up most of the certification process to allow STS-121 to press ahead with its July launch. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">In addition&nbsp;to the External Tank Design Certification Review,&nbsp;&nbsp;those presentations will include: <\/p>\n<p>Johnson Space Center (JSC) Verification of limitations for the ET TPS (Thermal Protection System) presentation from MSFC. Actions from STS-121 Debris Verification Review (DVR) to review all major non-standard repairs on ET-118 and ET-119. JSC \u2018prior to STS-121 FRR\u2019 LOX feedline fairing \u2013 as a separate debris source in the rollup risk matrix, plus hazard report for bi-pod closeout foam and IFR modification decision.<\/p>\n<p>Meanwhile, ET-118 \u2013 set to fly with Atlantis on STS-115 (STS-300) begun its journey from&nbsp;New Orleans, for an arrival at KSC around June 10. The tank is set to undergo a 30 day long ECO (Engine Cut Off) sensor swapout at KSC and is currently a long way behind its scheduled&nbsp;launch processing flow.<\/p>\n<p><em>Full coverage of the&nbsp;aforemented meetings and reviews are&nbsp;on L2.<\/em><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.lduhtrp.net\/image-1911168-10415279\" width=\"120\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/font><em><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"10\" src=\"http:\/\/www.awltovhc.com\/image-1911168-10419894\" width=\"120\" align=\"right\" vspace=\"10\" border=\"0\"><\/font><\/em><br \/><font face=\"Arial\" size=\"2\">&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/font><u><em><font face=\"Arial\" size=\"2\">LIVE&nbsp;UPDATE PAGES<\/font><\/em><\/p>\n<p><\/u><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA managers met on Wednesday to pour over the latest wind tunnel results, ahead of a crucial PRCB (Program Requirements Control Board) meeting on Thursday. A large number of documents have been collated as part of the External Tank Design Certification Review \u2013 which was a potential showstopper for Discovery\u2019s STS-121 mission, currently set to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-42048","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42048"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=42048"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42048\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=42048"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=42048"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=42048"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}