{"id":42050,"date":"2006-06-04T19:48:15","date_gmt":"2006-06-04T11:48:15","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-trying-to-head-off-shuttle-launch-delay\/"},"modified":"2006-06-04T19:48:15","modified_gmt":"2006-06-04T11:48:15","slug":"nasa-trying-to-head-off-shuttle-launch-delay","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-trying-to-head-off-shuttle-launch-delay\/","title":{"rendered":"NASA trying to head off Shuttle launch delay"},"content":{"rendered":"<p>STS-115\u2019s launch date could slip, should NASA fail to find a solution to the continuing problems with ET-118, which is having processing issues at the Michoud Assembly Facility (MAF) in New Orleans.  <\/p>\n<p>  A series of high level teleconferences took place over the weekend, as concerns grow over the evaporation of contingency days for the second launch of 2006, set to see Shuttle Atlantis re-start International Space Station (ISS) assembly missions.\n<\/p>\n<p><font color=\"#ff0000\"><em><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"90\" alt=\"\" hspace=\"5\" src=\"http:\/\/content.nasaspaceflight.com\/library\/1016\/logo2_1bk.jpg\" data-rel=\"penci-gallery-image-content\" width=\"182\" align=\"right\" vspace=\"5\" border=\"0\"><\/font><\/em><em><font face=\"Arial\" size=\"2\">L2, for&nbsp;expanded documents and information covering the&nbsp;space programs at work. See the huge amount of&nbsp;work that&nbsp;goes on behind the scenes.&nbsp;To join L2, click the advert \u2014&gt;<\/p>\n<p><\/font><font color=\"#0000ff\"><font face=\"Arial\" size=\"2\">**CLICK HERE FOR SELECTED SLIDES FROM THE FULL DOCUMENT SCANS&nbsp;ON L2**<\/font><br \/><\/font><\/em><\/font><br \/><font face=\"Arial\" size=\"2\">Sources indicate that the delay noted at Thursday\u2019s PRCB (<!--StartFragment -->Program Requirements Control Board)&nbsp;meeting left engineers with just \u2018a handful\u2019 of contingency days in STS-115\u2019s flow for the STS-300 (Launch On Need) requirement, with further delays due to unknown closeout problems \u2013 noted the following day \u2013 now threatening the planned launch date for Atlantis\u2019 primary mission. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">At present, Discovery\u2019s second test flight mission STS-121 is not believed to be threatened, due to a fluid CSCS (Contingency Shuttle Crew Support) date&nbsp;which has consistently expanded on recent manifests \u2013&nbsp;in the&nbsp;highly unlikely event the crew of STS-121 require rescuing from their \u2018Safe Haven\u2019 of the ISS&nbsp;by Atlantis. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"88\" alt=\"\" hspace=\"5\" src=\"http:\/\/logo.cafepress.com\/3\/4811501.1268853.jpg\" width=\"150\" align=\"left\" vspace=\"5\" border=\"0\">Already, NASA is working on reducing the delays incurred by ET-118\u2019s completion, as they focus on getting the tank over to Florida. <\/p>\n<p>One possibility that has been discussed&nbsp;consists of&nbsp;shipping the tank before its ECO (Engine Cut Off) sensors have been replaced. This now appears to be set and may allow for the shipping of the tank this week, as re-planned via Thursday\u2019s PRCB, minus ECO sensor R&amp;R and various closeout work.<\/p>\n<p>This would also involve the R&amp;R work being speeded up, faster than the process seen with ET-119\u2019s ECO sensor R&amp;R \u2013 which involved moving the tank from the vertical, to the horizontal for the R&amp;R work involving closeout of the TPS (Thermal Protection System) foam around the manhole access hatch at the aft of the tank, and back to the vertical for transfer to its mating with the twin solid rocket boosters. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"126\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=5995\" width=\"213\" align=\"left\" vspace=\"5\" border=\"0\">\u2018After ECO Sensor R&amp;R, the ET is required to be lifted out of the ET cell and placed on the transporter to perform AFT closeouts (Horizontal) KSC requested the closeouts be performed while the tank is still in the ET cell (Vertical),\u2019 noted a United Space Alliance document, dated June 1, and presented to the PRCB meeting of that date. \u2018Process saves one ET lift.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Schedules have been refined to optimize the work in the ET cell prior to placing the ET on the transporter. Closeouts performed in the ET cell save two days to the schedule, these are the days required to lift and place the ET on the transporter. Risk assessment was performed for ET-119 ECO R&amp;R. The ET-118 horizontal closeout will be the same, and previous risk assessment applies. Vertical and horizontal TPS closeout risk assessments are green.\u2019<\/p>\n<p><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"128\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=4983\" width=\"130\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/font><em><font color=\"#ff0000\"><font face=\"Arial\" size=\"2\">STS-121 Mission T-Shirt. Use discount code \u2018nasaspaceflight\u2019 when&nbsp;ordering from Countdown Creations &amp; receive 5% off!<\/p>\n<p><\/font><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"99\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=5373\" width=\"144\" align=\"right\" vspace=\"5\" border=\"0\"><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">NASASPACEFLIGHT.COM RSS FEED&nbsp;\u2014&gt;<br \/><\/font><\/font><\/em><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">  <\/p>\n<p>Lockheed\/MAF technicians would need to travel to the Kennedy Space Center, as they did for ET-119\u2019s ECO sensor R&amp;R. While special scaffolding constructed for worker access inside the Vehicle Assembly Building (VAB) won\u2019t be required for vertical work, the special tent and platforms will be required to keep a clean room environment. NASA is confident this can be done, as they recommended: <\/p>\n<p><\/font>  <\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018KSC can support closeout (both)&nbsp;in the ET cell (vertical) or in the transfer aisle (horizontal). We would prefer vertical to save the extra ET move and 2 day schedule impact, but understand the challenges MAF has to validate a vertical closeout.\u2019<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"150\" alt=\"\" hspace=\"0\" src=\"http:\/\/images.sc.cafepress.com\/product\/55490500v3_150x150_F.jpg\" data-rel=\"penci-gallery-image-content\" width=\"150\" align=\"left\" vspace=\"5\" border=\"0\">MAF (Michoud Assembly Facility) are understood to have approved this \u2018vertical closeout\u2019 procedure over the weekend, especially in light of their consistent objection&nbsp;to an alternative&nbsp;option on saving processing time with the tank, omitting the ECO sensor replacement. MAF fear that would add fuel to the debate on whether to revert to a 3 out of 4 LCC (Launch Commit Criteria) on the ECO sensors \u2013 something that has already been rejected by Shuttle managers for STS-121.<\/p>\n<p>Acquired documents note that around 30 days will be required by technicians to replace the LH2 ECO Sensors on ET-118 in the VAB \u2013 with one document noting the process (as of Thursday) would be completed on July 10. That date is understood to have slipped yet further. <\/font><\/p>\n<p>  Space Technology<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\">Another reason noted for the ECO sensor R&amp;R work to be moved to KSC is the growing issue of STS-115\u2019s supporting LON mission, currently tagged STS-301 with Discovery \u2013 ahead of her primary mission at the end of the year with STS-116. STS-301 will revert to STS-300 once Discovery\u2019s STS-121 mission has stood down the rescue requirement whilst in orbit.<\/p>\n<p>STS-301 will use ET-123, and concerns with&nbsp;that tank\u2019s processing have been voiced by MAF for some weeks. \u2018All hands\u2019 were moved to deal with ET-118\u2019s processing delays, to the detriment of ET-123. Contingency plans are being drawn up by ET managers, with large amounts of work yet to be started on that tank.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.lduhtrp.net\/image-1911168-10415279\" width=\"120\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/font><em><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"10\" src=\"http:\/\/www.awltovhc.com\/image-1911168-10419894\" width=\"120\" align=\"right\" vspace=\"10\" border=\"0\"><\/font><\/em><br \/><font face=\"Arial\" size=\"2\">&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/font><u><em><font face=\"Arial\" size=\"2\">LIVE&nbsp;UPDATE PAGES<\/font><\/em><\/p>\n<p><\/u><\/p>\n","protected":false},"excerpt":{"rendered":"<p>STS-115\u2019s launch date could slip, should NASA fail to find a solution to the continuing problems with ET-118, which is having processing issues at the Michoud Assembly Facility (MAF) in New Orleans. A series of high level teleconferences took place over the weekend, as concerns grow over the evaporation of contingency days for the second [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-42050","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42050"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=42050"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42050\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=42050"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=42050"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=42050"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}