{"id":42054,"date":"2006-05-30T20:16:46","date_gmt":"2006-05-30T12:16:46","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/iss-spacewalk-timeline\/"},"modified":"2006-05-30T20:16:46","modified_gmt":"2006-05-30T12:16:46","slug":"iss-spacewalk-timeline","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/iss-spacewalk-timeline\/","title":{"rendered":"ISS Spacewalk timeline"},"content":{"rendered":"<p>The International Space Station (ISS) crew, consisting of Russian commander Pavel Vinogradov and NASA science officer Jeffrey Williams, are in the final stages of preparing for their 5 hours 41 minute spacewalk, set for Thursday.   <\/p>\n<p>  NASASpaceflight.com has acquired the full run down of activities that will be carried out on the 65th spacewalk at the orbiting outpost.<br \/>\n<font face=\"Arial\" size=\"2\">  <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"150\" alt=\"\" hspace=\"5\" src=\"http:\/\/images.cafepress.com\/product\/50514821v5_150x150_B.jpg\" data-rel=\"penci-gallery-image-content\" width=\"150\" align=\"right\" vspace=\"5\" border=\"0\"><font color=\"#ff0000\"><em>Get your STS-121 mechandise and support this site at the same time. Full range can be viewed by clicking the image on the right.<\/em><\/font><\/font><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Ready to depart from the Pirs airlock on the Russian segment of the ISS at 6:51pm EDT, the crew will head to the Zvezda Service Module to carry out the installation of a new hydrogen vent valve for the Elektron oxygen-generation system. The system has broken down several times over recent years.<\/font>  <\/p>\n<p><font face=\"Arial\" size=\"2\">The Elektron system is still not being used due to its problems \u2013 although it is hoped they will regain its oxygen replenishment on the 5th of June. Currently, the docked Progress craft (M-356\/21P) is supplying oxygen for the ISS as required.<\/p>\n<p><\/font><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"125\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.lduhtrp.net\/image-1911168-10372152\" width=\"125\" align=\"left\" vspace=\"5\" border=\"0\"><\/font><font face=\"Arial\" size=\"2\">After taking imagery to confirm the installation has been successful, the crew will&nbsp;<!--StartFragment -->photograph the site of the KD2 engine cover obstruction,&nbsp;an area&nbsp;related to the aborted ISS reboost on the 19th of April. <\/p>\n<p>Other tasks involve: <\/font><font face=\"Arial\" size=\"2\">Removal of the platform with the third <b><\/b>(last<b><\/b>) Biorisk-MSN container on Pirs Docking Compartment. Removal of the BKDO Pressure Control and Exposure Monitor Sensor on Pirs Docking Compartment. Changing of the MBS <b><\/b>(Mobile Base System<b><\/b>) external TV camera on the U.S. segment <\/p>\n<p>Removal of the Kromka No. 3 contamination \u2018witness tablet\u2019 on Zvezda Service Module. Tightening the slack of cables around the WAL3 <b><\/b>(low gain<b><\/b>) antenna for ATV on Zvezda Service Module.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">In preparations for the EVA, the crew conducted a dry run for the spacewalk on Tuesday.<\/p>\n<p><font color=\"#ff0000\"><em><font face=\"Arial\"><img loading=\"lazy\" decoding=\"async\" height=\"90\" alt=\"\" hspace=\"5\" src=\"http:\/\/content.nasaspaceflight.com\/library\/1016\/logo2_1bk.jpg\" data-rel=\"penci-gallery-image-content\" width=\"182\" align=\"right\" vspace=\"5\" border=\"0\"><\/font><\/em><\/font>As published on NASASpaceflight\u2019s&nbsp;L2 section&nbsp;on May 22, the Golf Experiment that was to be conducted on this spacewalk has been cancelled. Canadian company Element 21 Golf Company paid the Russians for the advertising opportunity of a golf ball being propelled off the side of the ISS. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">However, the Russian\u2019s have cancelled the opportunity indefinitely due to safety concerns raised by NASA, after they communicated concerns that the golf ball might actually collide with the ISS \u2013 which is orbiting at 17,500 mph.<\/p>\n<p>Below is the full timeline preview.<\/p>\n<p><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"128\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=4984\" width=\"130\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/font><em><font color=\"#ff0000\"><font face=\"Arial\" size=\"2\">STS-121 Mission T-Shirt. Use discount code \u2018nasaspaceflight\u2019 when&nbsp;ordering from Countdown Creations &amp; receive 5% off!<\/p>\n<p><\/font><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"99\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=5373\" width=\"144\" align=\"right\" vspace=\"5\" border=\"0\"><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">NASASPACEFLIGHT.COM RSS FEED&nbsp;\u2014&gt;<br \/><\/font><\/font><\/em><br \/><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">  <\/p>\n<p><!--StartFragment --><font face=\"Arial\" size=\"2\"><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/><\/font><\/p>\n<p><\/font>  <font face=\"Arial\" size=\"2\">  <b><i><font face=\"Arial\" size=\"2\"><br \/>EVA-16 Preview for 6\/1 <\/font><\/i><\/b><i><font face=\"Arial\" size=\"2\">(all times EDT)<b>:<!--?xml:namespace prefix = o ns = \"urn:schemas-microsoft-com:office:office\" \/--><o:p><\/o:p><\/b><\/font><\/i>  <\/p>\n<ul style=\"MARGIN-TOP: 0in\" type=\"disc\">\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">~5:06pm:&nbsp; Close hatches between PkhO\/FGB and PkhO\/DC1<o:p><\/o:p><\/font>   <\/li>\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">~5:16pm:&nbsp; Don Orlans, close backpacks<o:p><\/o:p><\/font>   <\/li>\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">Check for leaks on suits and hatches<o:p><\/o:p><\/font>   <\/li>\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">~5:57pm:&nbsp; Final O2 purge of Orlan systems<o:p><\/o:p><\/font>   <\/li>\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">~6:00pm:&nbsp; Start&nbsp; prebreathe (30 min, to denitrogenize body for prevention of decompression sickness)<o:p><\/o:p><\/font>   <\/li>\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">~6:30pm:&nbsp; End prebreathe; depress DC1 to 15 mmHg<o:p><\/o:p><\/font>   <\/li>\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">~6:45pm:&nbsp; Switch Orlans to autonomous power<o:p><\/o:p><\/font>   <\/li>\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">~6:51pm:&nbsp; Open EV1 hatch<o:p><\/o:p><\/font>   <\/li>\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">Collect hardware in DC-1<o:p><\/o:p><\/font>   <\/li>\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">Egress DC-1 (ISS on SM thruster control)<o:p><\/o:p><\/font>   <\/li>\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">Install \u00e2\u20ac\u0153Yakor\u00e2\u20ac\u009d foot restraint on Strela crane (ISS to CMG control)<o:p><\/o:p><\/font>   <\/li>\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">Begin Elektron H2 Vent installation on SM<o:p><\/o:p><\/font>   <\/li>\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">Take closeout photos of H2 Vent<o:p><\/o:p><\/font>   <\/li>\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">Translate on Strela to WAL-2 antenna at SM aft end to photograph site of engine cover obstruction during aborted 4\/19 reboost (SM thrusters inhibited);<o:p><\/o:p><\/font>   <\/li>\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">Remove Kromka hardware.&nbsp; Remove Biorisk container (off Strela)<o:p><\/o:p><\/font>   <\/li>\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">Remove WAL-3 antenna cable slack.&nbsp; Remove BKDO (Contamination Monitoring Unit)<o:p><\/o:p><\/font>   <\/li>\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">Translate on Strela to DC-1, thence to FGB for MBS task (SM thrusters enabled, CMG control);<o:p><\/o:p><\/font>   <\/li>\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">MCC-H Handover \u00e2\u20ac\u201c begin MBS (Mobile Base System) Mast Camera swapout<o:p><\/o:p><\/font>   <\/li>\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">TsUP-Moscow Handover \u00e2\u20ac\u201c end MBS Camera swapout<o:p><\/o:p><\/font>   <\/li>\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">Translate on Strela to DC-1<o:p><\/o:p><\/font>   <\/li>\n<li class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1\"><font face=\"Arial\" size=\"2\">~12:26am: Ingress DC-1.&nbsp; Expected EVA duration = 5 hrs 41 min.<o:p><\/o:p><\/font>\n<p><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.lduhtrp.net\/image-1911168-10415279\" width=\"120\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/font><em><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"10\" src=\"http:\/\/www.awltovhc.com\/image-1911168-10419894\" width=\"120\" align=\"right\" vspace=\"10\" border=\"0\"><\/font><\/em><br \/><font face=\"Arial\" size=\"2\">&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/font><u><em><font face=\"Arial\" size=\"2\">LIVE&nbsp;UPDATES<\/font><\/em><\/p>\n<p><\/u><\/li>\n<\/ul>\n<p><\/font><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The International Space Station (ISS) crew, consisting of Russian commander Pavel Vinogradov and NASA science officer Jeffrey Williams, are in the final stages of preparing for their 5 hours 41 minute spacewalk, set for Thursday. NASASpaceflight.com has acquired the full run down of activities that will be carried out on the 65th spacewalk at the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-42054","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42054"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=42054"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42054\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=42054"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=42054"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=42054"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}