{"id":42060,"date":"2006-05-23T20:25:54","date_gmt":"2006-05-23T12:25:54","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/discovery-to-show-shes-ready\/"},"modified":"2006-05-23T20:25:54","modified_gmt":"2006-05-23T12:25:54","slug":"discovery-to-show-shes-ready","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/discovery-to-show-shes-ready\/","title":{"rendered":"Discovery to show she\u2019s ready"},"content":{"rendered":"<p>Shuttle Discovery will undergo a series of tests today during another key event of the preparations for the July launch of STS-121. The Flight Readiness Test (FRT) is a 24 hour process that will test the Space Shuttle Main Engines (SSMEs).  <\/p>\n<p>  Meanwhile, ET-117, an unmodified External Tank, has begun its trip back to the Michoud Assembly Facility (MAF).\n<\/p>\n<p><font face=\"Arial\" size=\"2\"><font color=\"#ff0000\"><em><font face=\"Arial\"><img loading=\"lazy\" decoding=\"async\" height=\"90\" alt=\"\" hspace=\"5\" src=\"http:\/\/content.nasaspaceflight.com\/library\/1016\/logo2_1bk.jpg\" data-rel=\"penci-gallery-image-content\" width=\"182\" align=\"right\" vspace=\"5\" border=\"0\"><\/font><\/em><em><font face=\"Arial\" size=\"2\">L2, one of the only places in the world you can view&nbsp;underground information on space flight in its&nbsp;full documented form.&nbsp;To join L2, click the advert \u2014&gt;<\/p>\n<p><font color=\"#0000ff\">**CLICK HERE FOR STS-121 LIVE UPDATE PAGES**<\/font><\/font><\/em><\/font><\/p>\n<p>The FRT will involve powering up the main engine controllers, activating the flight control system, checking the actuators, pneumatics, and engine valves then closing everything up and securing the systems. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The test follows a successful \u2018hot fire\u2019 of the Orbiter\u2019s three APUs (Auxiliary Power Units) on Sunday, prior to the giant RSS (Rotating Service Structure) being moved to surround Discovery for launch preparations. <\/p>\n<p>The APUs provide hydraulic power to key Shuttle systems, including the gimballing of the SSMEs, which will be part of the FRT today.<\/p>\n<p><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"128\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=4984\" width=\"130\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/font><em><font face=\"Arial\"><font size=\"2\"><font color=\"#ff0000\">STS-121 Mission T-Shirt. Use discount code \u2018nasaspaceflight\u2019 when&nbsp;ordering from Countdown Creations &amp; receive 5% off!<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"99\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=5373\" width=\"144\" align=\"right\" vspace=\"5\" border=\"0\"><\/p>\n<p>NASASPACEFLIGHT.COM RSS FEED&nbsp;\u2014&gt;<br \/><\/font><\/font><\/font><\/em><br \/><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/p>\n<p>Meanwhile, ET-117 was moved out of its checkout cell in the VAB (Vehicle Assembly Building) on Monday. The tank is heading back on a barge to New Orleans where it will undergo modifications at MAF. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">ET-117 is set to fly with Endeavour on STS-118, NET (No Earlier Than) June 11, 2007 on International Assembly Flight 13A.1, carrying S5 &amp; Spacehab-SM &amp; ESP3. This mission is set to be flight number five of the final 17 mission manifest prior to Shuttle retirement in 2010. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"150\" alt=\"\" hspace=\"5\" src=\"http:\/\/images.cafepress.com\/product\/55490500v3_150x150_F.jpg\" data-rel=\"penci-gallery-image-content\" width=\"150\" align=\"right\" vspace=\"5\" border=\"0\">NASA is rumoured to be aiming for a NET May 1, 2007 launch target, although ET processing is continuing to give concerns on the ability to turnaround the tanks in time. The latest information on this tank was noted as \u2018STS-118 Launch 11 Jun: 70 days for KSC to process ET-117 (red risk). STS-117 slip may impact STS-118 Launch due to KSC VAB High bay door mod.\u2019<\/p>\n<p>ET-117 requires a full set of modifications, with the removal of its PAL (Protuberance Air Load) ramp, Bi-Pod ramp foam and a changeout of its ECO (Engine Cut Off) sensors. It is set to leave KSC today for the five day trip to New Orleans. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">STS-121 most crucial date comes in less than three weeks, with Shuttle managers meet to hear the results of the Design Certification Review \u2013 which will ultimately determine if the modified External Tanks are safe to fly, following analysis of the complete wind tunnel test data.<\/p>\n<p><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.lduhtrp.net\/image-1911168-10415279\" width=\"120\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/font><em><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"10\" src=\"http:\/\/www.awltovhc.com\/image-1911168-10419894\" width=\"120\" align=\"right\" vspace=\"10\" border=\"0\"><\/font><\/em><br \/><font face=\"Arial\" size=\"2\">&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/font><u><em><font face=\"Arial\" size=\"2\">LIVE&nbsp;UPDATE PAGES<\/font><\/em><\/p>\n<p><\/u><\/font><\/p>\n<p>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Shuttle Discovery will undergo a series of tests today during another key event of the preparations for the July launch of STS-121. The Flight Readiness Test (FRT) is a 24 hour process that will test the Space Shuttle Main Engines (SSMEs). Meanwhile, ET-117, an unmodified External Tank, has begun its trip back to the Michoud [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-42060","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42060"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=42060"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42060\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=42060"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=42060"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=42060"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}