{"id":42075,"date":"2006-05-04T23:42:36","date_gmt":"2006-05-04T15:42:36","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/prcb-no-tanking-test-for-sts-121\/"},"modified":"2006-05-04T23:42:36","modified_gmt":"2006-05-04T15:42:36","slug":"prcb-no-tanking-test-for-sts-121","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/prcb-no-tanking-test-for-sts-121\/","title":{"rendered":"PRCB: NO tanking test for STS-121"},"content":{"rendered":"<p>Today\u2019s PRCB (Program Requirements Control Board) meeting has decided against a tanking test \u2013 which was provisionally set for June 1 \u2013 ahead of STS-121\u2019s launch, following objections across the board, leaving Shuttle manager Wayne Hale with no choice but to call off the tanking test.  <\/p>\n<p>  Meanwhile, the Michoud Assembly Facility have noted they are pulling out all the stops on ET-118, which is required at the Kennedy Space Center for Atlantis, in time to support STS-300 requirements.\n<\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"141\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.countdowncreations.com\/images\/shuttle_25th_t.jpg\" data-rel=\"penci-gallery-image-content\" width=\"125\" align=\"left\" vspace=\"5\" border=\"0\"><\/font><font color=\"#ff0000\"><font face=\"Arial\" size=\"2\"><em>Space Shuttle 25th Anniversary T-Shirt. Use discount code \u2018nasaspaceflight\u2019 when ordering from Countdown Creations &amp; receive 5% off!<\/em><\/font><\/p>\n<p><\/font><font face=\"Arial\" size=\"2\"><em>Updated at 2:27pm Eastern, 4th May.<\/em><\/p>\n<p>Shuttle managers heard from KSC\u2019s MK-SIO\/J. Draus, and Marshall Space Flight Center\u2019s ED01\/R. Champion, while Lockheed Martin\u2019s Wanda Sigur was&nbsp;also present at the meeting to give updates on the status of the External Tanks.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The tanking test requirement \u2013 it had been argued \u2013&nbsp;was based on the need to checkout the new ECO (Engine Cut Off) sensors, recently replaced by Lockheed technicians, following the detection of a phase shift in one of the crucial sensors during the checkout of ET-119 in the VAB (Vehicle Assembly Building).<\/font><\/p>\n<p><font face=\"Arial\"><font size=\"2\">However, engineers feel such a test can be carried out during the launch countdown, as opposed to cryoloading the tank a month prior to launch. Engineers also point to the tests carried out on ET-120 \u2013 which determined that the more times a tank is cycled through tanking, the higher the risk microscopic cracks will form, in turn risking foam liberation on ascent.<\/p>\n<p>Following confirmation from sources at MSFC, MAF and KSC, the decision was met with surprise, yet optimism that the Program didn\u2019t overrule their concerns.<\/p>\n<p><font color=\"#ff0000\"><font face=\"Arial\"><em><img loading=\"lazy\" decoding=\"async\" height=\"90\" alt=\"\" hspace=\"5\" src=\"http:\/\/content.nasaspaceflight.com\/library\/1016\/logo2_1bk.jpg\" width=\"182\" align=\"right\" vspace=\"5\" border=\"0\"><\/em><\/font><\/font><em><font face=\"Arial\" color=\"#ff0000\">Live updates and information resulting from the PRCB&nbsp;are available on L2. Full PRCB Documentation relating to this article&nbsp;will be available on L2 from the weekend.<\/p>\n<p><\/font><\/em>\u2018Well, we\u2019ve been against it from the start \u2013 because they were going to take the test all the way through prepress,\u2019 said one source, who asked&nbsp;not to be named.<\/font><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Prepress is short for&nbsp;\u2018tank pre-pressurization,\u2019 which&nbsp;occurs at T-154 seconds for LO2 tank, T-104 sec for LH2 tank \u2013 and pressurizes each tank with helium to get them at flight levels prior to lift-off.&nbsp; <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"125\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.awltovhc.com\/image-1911168-10418554\" width=\"125\" align=\"left\" vspace=\"5\" border=\"0\">\u2018When you pressurize the tanks that high, you add a \u2018pressure cycle\u2019 to the tank \u2013 something that is ultimately not good for it.&nbsp; <\/font><\/p>\n<p><font size=\"2\"><font face=\"Arial\">\u2018It\u2019s possible that by doing this, they\u2019d increase the chances that foam cracking could occur.\u2019<\/p>\n<p>Another source noted that very little by way of rationale for the tanking test was put forward at the PRCB \u2013 as the meeting failed to mirror the split of opinion that&nbsp;<font face=\"Arial\" size=\"2\">occurred <\/font>the week previously during the debate on which option of modification the Program would fly with for&nbsp;ET-119.<\/p>\n<p>\u2018No one spoke up when (Hale) asked for rationale to support the tanking test,\u2019 the source added. \u2018He was left with no choice at this meeting. MSFC presented an excellent case against the test.\u2019<br \/><\/font><br \/><\/font><font face=\"Arial\" size=\"2\"><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"125\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.tqlkg.com\/image-1911168-10422785\" width=\"125\" align=\"left\" vspace=\"5\" border=\"0\"><\/font>Meanwhile, work on ET-118, the second flight tank for 2006, continues to increase as the May 30 delivery date approaches. <\/p>\n<p>The tank, which is in Building 420, Cell 2, now has two critical path activities: installation of Developmental Flight Instrumentation (DFI) and completing modifications to the bipod.<\/font><\/p>\n<p>  Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket building kits<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Our employees are virtually all over the tank right now,\u2019 says Wanda Sigur, ET Project vice president at Lockheed Martin, in a \u2018Mission Success\u2019 announcement to employees. \u2018There\u2019s plenty of work to do, and we\u2019re making progress on all fronts.\u2019 <\/p>\n<p>Lockheed and MAF note that DFI will provide flight data on how the tank performs without Protuberance Airloads (PAL) ramps, the major modification from ET-121 that flew on the STS-114 mission last summer. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.awltovhc.com\/image-1911168-10420838\" width=\"120\" align=\"left\" vspace=\"5\" border=\"0\">ET-118 will be the second tank to fly without the ramps. Schedule pressure was the apparent reason for ET-119 to go without DFI for STS-121.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Currently DFI tube reinstallation has been completed for both the external Liquid Oxygen Tank and Liquid Hydrogen Tank cable trays,\u2019 the \u2018Mission Success\u2019 report noted. \u2018Technicians have also completed the roughrouting of accelerometers to the filters and harnesses inside the Intertank.<\/font><\/p>\n<p><em><font color=\"#ff0000\"><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"90\" alt=\"\" hspace=\"5\" src=\"http:\/\/content.nasaspaceflight.com\/library\/1016\/AdBanners\/storelogo3.jpg\" data-rel=\"penci-gallery-image-content\" width=\"182\" align=\"left\" vspace=\"5\" border=\"0\"><\/font><\/font><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Crews continue to work on bipod modifications as well. Completion of the initial Thermal Protection Systems (TPS) work will take place prior to wire bonding and sealing, which will be followed by the final TPS closeout spray.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The longerons, bellows drip-lip, camera placement and antenna, diffuser and ice frost ramps are also \u2018in works\u2019 on the tank.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">ET-123 will be the next tank to be worked on, following the shipping of ET-118.<\/p>\n<p><\/font><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.lduhtrp.net\/image-1911168-10415279\" width=\"120\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/font><em><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"10\" src=\"http:\/\/www.awltovhc.com\/image-1911168-10419894\" width=\"120\" align=\"right\" vspace=\"10\" border=\"0\"><\/font><\/em><br \/><font face=\"Arial\" size=\"2\">&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;<\/font><u><em><font face=\"Arial\" size=\"2\">LIVE&nbsp;UPDATE PAGES<\/font><\/em><\/p>\n<p><\/u><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Today\u2019s PRCB (Program Requirements Control Board) meeting has decided against a tanking test \u2013 which was provisionally set for June 1 \u2013 ahead of STS-121\u2019s launch, following objections across the board, leaving Shuttle manager Wayne Hale with no choice but to call off the tanking test. Meanwhile, the Michoud Assembly Facility have noted they are [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-42075","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42075"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=42075"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42075\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=42075"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=42075"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=42075"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}