{"id":42082,"date":"2006-04-27T19:36:00","date_gmt":"2006-04-27T11:36:00","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/msfc-et-re-design-dismissed-muratore-re-assigned\/"},"modified":"2006-04-27T19:36:00","modified_gmt":"2006-04-27T11:36:00","slug":"msfc-et-re-design-dismissed-muratore-re-assigned","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/msfc-et-re-design-dismissed-muratore-re-assigned\/","title":{"rendered":"MSFC ET re-design dismissed \/ Muratore re-assigned"},"content":{"rendered":"<p>Sources are noting that Marshall Space Flight Center (MSFC) have seen their request for a design change to the External Tanks dismissed by managers at the Johnson Space Center during today\u2019s heated PRCB (Program Requirements Control Board) meeting.  <\/p>\n<p>  Meanwhile, seperate sources are claiming John Muratore, Manager for Shuttle Systems Engineering and Integration, has been re-assigned to a position that has no influence on Shuttle decisions.<br \/>\n<font face=\"Arial\" size=\"2\">  <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em><font color=\"#ff0000\"><img loading=\"lazy\" decoding=\"async\" height=\"90\" alt=\"\" hspace=\"5\" src=\"http:\/\/content.nasaspaceflight.com\/library\/1016\/AdBanners\/storelogo3.jpg\" data-rel=\"penci-gallery-image-content\" width=\"182\" align=\"left\" vspace=\"5\" border=\"0\"><\/font><\/em><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><font color=\"#ff0000\">&lt;\u2014**New stock in-store now. Show your support for manned space flight and support this site at the same time**<\/font><\/p>\n<p>Remaining issues with the tank comes as a surprise, following encouraging wind tunnel testing \u2013 which is still on-going \u2013 on the modified ET test article.<\/font>  <\/p>\n<p><font face=\"Arial\" size=\"2\">The ice\/frost ramps appear to be the focus of attention again, with further work on \u2018shaving\u2019 the ramps down being part of the Wind Tunnel process. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"100\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=4438\" width=\"152\" align=\"right\" vspace=\"5\" border=\"0\">A small section of foam did liberate from the ice\/frost ramp during a 30 second high aerodynamic pressure run, although that was believed to be over 1000 psf \u2013 much higher than a Shuttle can expect to encounter during ascent.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">To aid the reduction in foam shedding, NASA recently confirmed they would fly STS-121 with a \u2018Low Q\u2019 mission profile, which will keep the stack below 735 psf during the ride uphill. Wind Tunnel tests below 735 psf encountered no problems during evaluations.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">It is possible, though not confirmed, that MSFC requested that the ice\/frost ramps on all future External Tanks, including ET-119 \u2013 currently awaiting Discovery\u2019s arrival for mating in the VAB (Vehicle Assembly Building) \u2013 undergo the extra \u2018shaving down\u2019 as undertaken at the wind tunnel tests.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em><font face=\"Arial\" color=\"#ff0000\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"90\" alt=\"\" hspace=\"5\" src=\"http:\/\/content.nasaspaceflight.com\/library\/1016\/logo2_1bk.jpg\" data-rel=\"penci-gallery-image-content\" width=\"182\" align=\"right\" vspace=\"5\" border=\"0\"><\/font><\/em>However, it is understood that during today\u2019s PRCB the recommendation was rejected, with the decision to proceed with flying the tank \u2018as is.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Discovery is currently schedule to fly this July on STS-121 \u2013 the second of two test flights prior to the re-start of International Space Station (ISS) assembly flights.<\/p>\n<p>A re-design would have likely led to a 12-18 month&nbsp;downtime period for the Shuttle fleet, a highly undesirable option for the Program.<\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.lduhtrp.net\/image-1911168-10415279\" width=\"120\" align=\"left\" vspace=\"5\" border=\"0\"><\/font><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"10\" src=\"http:\/\/www.awltovhc.com\/image-1911168-10419894\" width=\"120\" align=\"right\" vspace=\"10\" border=\"0\"><br \/>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;<em><u>LIVE&nbsp;UPDATE PAGES<\/p>\n<p><\/u><\/em><\/font><\/p>\n<p>  NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight history books<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>Shuttle managers are set to give an update to the status of STS-121 during tomorrow\u2019s media conference. <\/font><\/p>\n<p>NASA Administrator Michael Griffin and Associate Administrator for Space Operations William Gerstenmaier will brief the media&nbsp;at 11 a.m. EDT. The briefing will be held at NASA Headquarters in Washington, DC.<\/p>\n<p>Space Shuttle Program Manager Wayne Hale will join them electronically from NASA\u2019s Marshall Space Flight Center, Huntsville, Ala. NASA TV will air the briefing live. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"141\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.countdowncreations.com\/images\/shuttle_25th_t.jpg\" width=\"125\" align=\"left\" vspace=\"5\" border=\"0\"><em><font face=\"Times New Roman\" color=\"#ff0000\" size=\"3\">Space Shuttle 25th Anniversary T-Shirt. Use discount code \u2018nasaspaceflight\u2019 when ordering from Countdown Creations &amp; receive 5% off<\/font><\/em><br \/><font face=\"Arial\" size=\"2\"><br \/><\/font><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sources are noting that Marshall Space Flight Center (MSFC) have seen their request for a design change to the External Tanks dismissed by managers at the Johnson Space Center during today\u2019s heated PRCB (Program Requirements Control Board) meeting. Meanwhile, seperate sources are claiming John Muratore, Manager for Shuttle Systems Engineering and Integration, has been re-assigned [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-42082","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42082"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=42082"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42082\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=42082"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=42082"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=42082"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}