{"id":42122,"date":"2006-03-14T20:28:32","date_gmt":"2006-03-14T12:28:32","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/eco-change-out-no-easy-process\/"},"modified":"2006-03-14T20:28:32","modified_gmt":"2006-03-14T12:28:32","slug":"eco-change-out-no-easy-process","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/eco-change-out-no-easy-process\/","title":{"rendered":"ECO change-out \u2013 no easy process"},"content":{"rendered":"<p>More information has come to light on the intriguing process that will be undertaken by Lockheed and United Space Alliance techinicans on ET-119.  <\/p>\n<p>  Workers will have to build a climate controlled tent around the aft dome section of the tank, as they change-out faulty ECO (Engine Cut Off) sensors, a process that recieved NASA management approval today, delaying STS-121 to July, as exclusively revealed by this site.\n<\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"90\" alt=\"\" hspace=\"5\" src=\"http:\/\/content.nasaspaceflight.com\/library\/1016\/AdBanners\/logo2_1bk.jpg\" data-rel=\"penci-gallery-image-content\" width=\"182\" align=\"left\" vspace=\"5\" border=\"0\"><\/font><\/p>\n<p><em>Latest manifest documents, same day ISS On-Orbit reports, Discovery RMS damage images, live \u2018as-it-happens\u2019 newsflashes and updates, ET wind tunnel test latest, plus much more \u2013 <\/em><em>Join L2 today.<\/em><font face=\"Arial\" size=\"2\"><\/font><\/p>\n<p><em><\/em>  <\/p>\n<p><font face=\"Arial\" size=\"2\">Currently a 17 day process \u2013 as per work schedule if all goes&nbsp;to plan&nbsp;\u2013 technicians will begin work on the tank with a \u2018foam dig\u2019 \u2013 where insulation foam surrounding the aft dome access door is removed from the tank. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Before entering the tank, a climate control tent will surround the whole aft section of the tank, with the aim in creating a \u2018particulate free environment\u2019 \u2013 a process made more difficult by work currently being carried out on the Vehicle Assembly Building (VAB) roof and doors. It\u2019s not clear if that work will be halted during this process.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Lockheed specialists will then work on replacing the ECO sensors, likely to be all of the LH2 sensors. Certification work will be carried out on the new sensors before the more complicated process of foam re-application begins. <img loading=\"lazy\" decoding=\"async\" height=\"90\" alt=\"\" hspace=\"5\" src=\"http:\/\/content.nasaspaceflight.com\/library\/1016\/AdBanners\/storelogo3.jpg\" width=\"182\" align=\"right\" vspace=\"5\" border=\"0\"><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">It is vital that the clean room environment is adhered to around the tank, with the risk of contamination damage to the inner workings of the tank being avoided at all costs. <\/font><\/p>\n<p>  SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket building kits<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\">Once satisfied the ECO sensor problem has been fixed, workers will carefully lift the tank \u2013 still with large areas of its aft dome missing insulation foam \u2013 on to the transporter it arrived in the VAB with, using a VAB crane and lanyards. <\/p>\n<p>This process will also be critical, following an incident with ET-121, which was cosmetically damaged by a loose lanyard last year. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">One safely removed from the checkout cell into the VAB transfer aisle, the tank \u2013 now horizontal \u2013 will undergo closeouts and foam re-application. This transfer has to take place as Lockheed don\u2019t have a process of foam application for the aft dome of the ET in the vertical position. <\/font><\/p>\n<p><font size=\"2\"><font face=\"Arial\">Once work is completed, the tank will once again be moved into the vertical, placed back in the checkout cell, and will undergo the same testing that initially confirmed a phase shift with an LH2 ECO sensor.<\/font><font face=\"Arial\">&nbsp;<\/font><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"90\" alt=\"\" hspace=\"5\" src=\"http:\/\/content.nasaspaceflight.com\/library\/1016\/AdBanners\/whiteback.gif\" data-rel=\"penci-gallery-image-content\" width=\"182\" align=\"left\" vspace=\"5\" border=\"0\"><\/font><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.lduhtrp.net\/image-1911168-5526129\" width=\"120\" align=\"left\" vspace=\"5\" border=\"0\"><\/font><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"40\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.tqlkg.com\/image-1911168-10410772\" width=\"150\" align=\"left\" vspace=\"5\" border=\"0\"><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">&nbsp;<em>&nbsp;<\/em><br \/><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">Stay up-to-date via our space flight specific forum<\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>More information has come to light on the intriguing process that will be undertaken by Lockheed and United Space Alliance techinicans on ET-119. Workers will have to build a climate controlled tent around the aft dome section of the tank, as they change-out faulty ECO (Engine Cut Off) sensors, a process that recieved NASA management [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-42122","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42122"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=42122"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42122\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=42122"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=42122"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=42122"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}