{"id":42243,"date":"2005-11-02T19:04:07","date_gmt":"2005-11-02T11:04:07","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/fully-operational-maf\/"},"modified":"2005-11-02T19:04:07","modified_gmt":"2005-11-02T11:04:07","slug":"fully-operational-maf","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/fully-operational-maf\/","title":{"rendered":"Fully Operational \u2013 MAF"},"content":{"rendered":"<p>The Michoud Assembly Facility (MAF) in New Orleans has declared itself fully operational, following its recovery from Hurricane Katrina.  <\/p>\n<p>  Integral to NASA\u2019s Return to Flight 3, MAF is back to full speed on efforts to send modified External Tanks (ETs) back to the Kennedy Space Center in time to support a May launch of STS-121.<br \/>\n<font face=\"Arial\">  <\/font><\/p>\n<p><font face=\"Arial\"><font face=\"arial, helvetica, sans-serif\">Lockheed Martin Michoud Operations Vice President and General Manager of MAF, Marshall Byrd, made the declaration by addressing media at the plant last night, adding his praise to the workers who suffered more than the facility itself during the devastating hurricane.<\/font><\/font><\/p>\n<p><font face=\"arial, helvetica, sans-serif\"> <\/font><\/p>\n<p><font face=\"arial, helvetica, sans-serif\">While the plant escaped major damage, Byrd said that 600 members of the workforce lost their homes, as the nearby Slidell area of New Orleans \u2013 where most of the MAF workers live \u2013 was hit hard by Katrina. <\/font><\/p>\n<p><font face=\"arial, helvetica, sans-serif\">300 of those workers in Slidell cannot return to their homes for some time and some 2,000 employees are in need of help with their housing requirements. Lockheed Martin has even leased a hotel complex for 140 of its workers.<\/font><font face=\"arial, helvetica, sans-serif\"> <\/font><\/p>\n<p><font face=\"arial, helvetica, sans-serif\">Boosting recent comments from Space Shuttle manager Wayne Hale, Byrd noted that the facility is now fully focused on supporting the May launch date, currently a NET (No Sooner Than) target of May 3 for Discovery on STS-121.<\/font><font face=\"arial, helvetica, sans-serif\"> <\/font><\/p>\n<p><font face=\"arial, helvetica, sans-serif\">\u201cToday, we consider ourselves fully operational,\u201d he said, quoted in the Advocate. \u201cIt\u2019s a big day for the product but it\u2019s a bigger day for the people.\u201d<\/font><font face=\"arial, helvetica, sans-serif\"> <\/font><\/p>\n<p><font face=\"arial, helvetica, sans-serif\">MAF needs to turn around two ETs, namely ET-119 and ET-120, to support this mission, with Atlantis requiring her own tank for the supporting role of STS-300. Atlantis is primarily set to launch on a NET date of July 1, on STS-115.<\/font><font face=\"arial, helvetica, sans-serif\"> <\/font><\/p>\n<p><font face=\"arial, helvetica, sans-serif\">Modifications to the ETs involve removing the PAL Ramp \u2013 which proved troublesome during STS-114\u2019s ascent \u2013 and replacing it with a shorter foam wedge of a ramp, including a new application process, in the hope that it will not shed foam as it did during launch earlier this year.<\/font><font face=\"arial, helvetica, sans-serif\"> <\/font><\/p>\n<p>  SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"arial, helvetica, sans-serif\">NASA is expecting a report from all their key Shuttle processing facilities over the coming days, from which they will form a conclusion on officially setting the NET launch dates for the next six missions. <\/font><\/p>\n<p><font face=\"arial, helvetica, sans-serif\">MAF should help NASA come to a positive conclusion in that regard, as Byrd explained that despite the chaos of Katrina, only a handful of facility\u2019s skilled workforce have decided to leave in the aftermath.<\/font><font face=\"arial, helvetica, sans-serif\"> <\/font><\/p>\n<p><font face=\"arial, helvetica, sans-serif\">  <\/p>\n<p>\u201cI feel really good about that,\u201d he added. \u201cThat\u2019s a tribute to NASA and Lockheed.\u201d<\/p>\n<p><\/font><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Michoud Assembly Facility (MAF) in New Orleans has declared itself fully operational, following its recovery from Hurricane Katrina. Integral to NASA\u2019s Return to Flight 3, MAF is back to full speed on efforts to send modified External Tanks (ETs) back to the Kennedy Space Center in time to support a May launch of STS-121. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-42243","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42243"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=42243"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42243\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=42243"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=42243"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=42243"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}