{"id":42344,"date":"2005-07-20T21:31:50","date_gmt":"2005-07-20T13:31:50","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/keeping-eco-at-4-for-4-a-must-for-some\/"},"modified":"2005-07-20T21:31:50","modified_gmt":"2005-07-20T13:31:50","slug":"keeping-eco-at-4-for-4-a-must-for-some","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/keeping-eco-at-4-for-4-a-must-for-some\/","title":{"rendered":"Keeping ECO at 4 for 4 \u2013 a must for some"},"content":{"rendered":"<p>With the Engine Cut Out sensors continuing to gain more attention with regard to Shuttle Discovery\u2019s long awaited launch, NASA managers have been mulling over the idea of reducing the requirement to 3 out of 4 \u2013 to enable a launch to proceed.\n<\/p>\n<p><font face=\"arial, helvetica, sans-serif\">When one ECO (LH2 number 2) started to show an intermittent fault less than two hours prior to the scheduled launch last Wednesday, engineers immediately went looking for the cause \u2013 through a troubleshooting process.<\/font><\/p>\n<p><font face=\"arial, helvetica, sans-serif\">Most passionate are the people who want the requirement to remain at 4 out of 4 working ECOs. At Wednesday evening\u2019s press conference, NASA managers believe the issue is electo-magnetic based and will be prepared for \u2018expected issues\u2019 with the ECOs. Any unexpected issue will result in a launch scrub.<\/font><\/p>\n<p><font face=\"arial, helvetica, sans-serif\">NASA has set a new tenative launch date for the shuttle Discovery \u2013 Tuesday, July 26. <\/font>  <\/p>\n<p><font face=\"arial, helvetica, sans-serif\"><\/font><\/p>\n<\/p>\n<p><font face=\"arial, helvetica, sans-serif\">\u201cRight now we think we have eliminated all possible causes related to the glitch,\u201d&nbsp;Shuttle manager&nbsp;Bill Parson said. <\/font>  <\/p>\n<p><font face=\"arial, helvetica, sans-serif\"><font face=\"arial, helvetica, sans-serif\">Even though there have been numerous improvements and enhancements over the years, the Space Shuttle is still a phenomenally complex vehicle. The electronics are staggeringly complicated, highlight not least by the current inability of Kennedy Space Center engineers<\/font> continuing to find out why \u2013 after the issue from Tanking Test 1 \u2013 the issue has not been solved. During and immediately after Tanking Test 1, two ECO sensors (3 and 4) failed in similar fashion to ECO 1 during the launch attempt last Wednesday.<\/font><font face=\"arial, helvetica, sans-serif\"> <\/font><\/p>\n<p><font face=\"arial, helvetica, sans-serif\">Searching for the problem has brought up several possibilities. One that has gained ground this week is an apparent problem with the LH2 ECO number 2 SIM circuit. Engineers have noted \u2013 while not in public \u2013 that the problem appears when the SIM circuit is turned on, yet disappears when the SIM circuit is turned off. This at least \u2013 if found to be top of the fault tree \u2013 gives hope that the problem&nbsp;may not be&nbsp;as \u201cintermittent\u201d as Shuttle manager Wayne Hale noted this week during a MMT press conference. <\/font><\/p>\n<p><font face=\"arial, helvetica, sans-serif\">With the error with the ECO coming in the form of it registering \u201c0\u201d or WET, the issue may also be down to wiring, possibly a short somewhere between the Point Sensor Box and the ECO sensor.<\/font><font face=\"arial, helvetica, sans-serif\"> <\/font><\/p>\n<p>  NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space tourism guides<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"arial, helvetica, sans-serif\">Keeping the 4 out of 4 ECO sensor requirement could be perceived as ensuring the general public don\u2019t feel there is a reduction in safety \u2013 especially with this being the first launch since the loss of Columbia on STS-107 two and a half years ago. <\/font><\/p>\n<p><font face=\"arial, helvetica, sans-serif\">With the ECO sensors becoming armed seconds prior to the planned MECO (Main Engine Cut Out) \u2013 both triggered by real-time shuttle velocity calculations, the absolute requirement for the ECO system is so important due to the dangers of a miscalculation in cutting off the main engines too soon or too late. Too soon and a risky abort may be called, too late and the Orbiter could be destroyed by its own engines \u2013 sucking up ullage gas, rather than propellant. <\/font><\/p>\n<p><font face=\"arial, helvetica, sans-serif\">The four out of four methodology was determined based on a very careful study by system experts, originally studied for the Apollo Program \u2013 which the Shuttle was born out of in later years \u2013 and the ECO sensors are classed as critical flight hardware.<\/font><font face=\"arial, helvetica, sans-serif\"> <\/font><\/p>\n<p><font face=\"arial, helvetica, sans-serif\">The problem with this particular hardware is due to two ECO sensors being on the same electrical bus. If that bus was lost, the Shuttle could find itself with serious problems.<\/font><font face=\"arial, helvetica, sans-serif\"> <\/font><\/p>\n<p><font face=\"arial, helvetica, sans-serif\">However, a reduction in requirement to 3 out of 4 has already been looked at before. <\/font><\/p>\n<p><font face=\"arial, helvetica, sans-serif\">A group of NASA engineers spent a huge amount of money composing a study on the effects of reverting to a 3 out of 4 requirement with the ECOs. Without consulting External Tank construction engineers and designers, the study made the IRN (Interface Revision Notice) stage. Also apparently in the dark was the PSIG (Propulsion System Integration Group) \u2013 a consortium of NASA, Lockheed Martin, Boeing and Rocketdyne propulsion engineers who met several times a week to discuss such issues. Once discovered, the study was bitterly opposed.<\/font><font face=\"arial, helvetica, sans-serif\"> <\/font><\/p>\n<p><font face=\"Arial\">  <\/p>\n<p><font face=\"arial, helvetica, sans-serif\">It was eventually thrown out by high-level NASA managers after the groups that had been left in the dark took their grievances to the very top of the NASA management structure.<\/font><\/p>\n<p><font face=\"arial, helvetica, sans-serif\">Any decision that will come on the ECO sensor requirements is likely to dig up these previous issues. A solution to the current fault that is undergoing troubleshooting would be the best conclusion to those that wish to see the current ECO requirements remain.<\/font><\/p>\n<p><\/font><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With the Engine Cut Out sensors continuing to gain more attention with regard to Shuttle Discovery\u2019s long awaited launch, NASA managers have been mulling over the idea of reducing the requirement to 3 out of 4 \u2013 to enable a launch to proceed. When one ECO (LH2 number 2) started to show an intermittent fault [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-42344","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42344"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=42344"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42344\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=42344"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=42344"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=42344"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}