{"id":42394,"date":"2005-05-12T17:21:13","date_gmt":"2005-05-12T09:21:13","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/discoverys-no-sooner-than-date-slipping\/"},"modified":"2005-05-12T17:21:13","modified_gmt":"2005-05-12T09:21:13","slug":"discoverys-no-sooner-than-date-slipping","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/discoverys-no-sooner-than-date-slipping\/","title":{"rendered":"Discovery\u2019s \u2018no sooner than\u2019 date slipping"},"content":{"rendered":"<p>Shuttle Discovery won\u2019t be launched before July 18, according to one United Space Alliance (USA) source, with the next Tanking Test also delayed until next Tuesday. <br \/>  NASA has not officially announced the launch date slip.\n<\/p>\n<p><font face=\"arial, helvetica, sans-serif\">The slip in the Tanking Test \u2013 to be conducted on STS-114 before roll-back to the Vehicle Assembly Building (VAB)&nbsp; \u2013 came after&nbsp;t<!--StartFragment -->he design center added a number of new requirements to be implemented on the test, including special instrumentation. The installation&nbsp;work will&nbsp;continue over this weekend&nbsp;\u2013 which was scheduled&nbsp;for the Tanking Test.<\/font>  <font face=\"arial, helvetica, sans-serif\">&nbsp;<\/font>  <font face=\"arial, helvetica, sans-serif\">The new equipment is believed to be part of trying to establish why two&nbsp;<!--StartFragment -->ECO sensors behaved erratically during the first Tanking Test \u2013 while also monitoring why&nbsp;<!--StartFragment -->the pre-pressurization of the LOX tank <!--StartFragment -->took 12 cycles \u2013 twice as many as normally expected.<\/font>  <font face=\"arial, helvetica, sans-serif\">&nbsp;<\/font>  <font face=\"arial, helvetica, sans-serif\">Troubleshooting External Tank (ET) issues is now the main focus to ensure a green light for the July window \u2013 which closes at the end of that month. Any more major issues or delays risk pushing Return to Flight into the next available window&nbsp;\u2013 in September.<\/font>  <br \/><font face=\"arial, helvetica, sans-serif\">\u201cI saw a preliminary schedule that showed we will have to work all weekends and both holidays\u2026so we can make July 18th,\u201d said one source who can\u2019t be named.<\/font>  <font face=\"arial, helvetica, sans-serif\">&nbsp;<\/font>  <font face=\"arial, helvetica, sans-serif\">With the delay of the Tanking Test, roll-back of STS-114 won\u2019t occur until at least the second half of next week. Once back in the VAB, Discovery will be de-mated from her ET and Solid Rocket Boosters (SRBs) and mated with the stack that was pencilled in for Atlantis\u2019 STS-121 (300). That won\u2019t be immediate as work on STS-121\u2019s ET involves the installation of a new heater to reduce ice build-up along the<!--StartFragment --> 70-foot liquid oxygen&nbsp;propellant line.<\/font>  <font face=\"arial, helvetica, sans-serif\">&nbsp;<\/font>  <font face=\"arial, helvetica, sans-serif\">Atlantis \u2013 who is the support Orbiter for STS-114 \u2013 will be stacked with ET-119, which should arrive from&nbsp;<!--StartFragment -->NASA\u2019s Michoud Assembly Facility in New Orleans in time to support a July launch. ET-119 is the first External Tank that has the heater modification already in place.<\/font>  <font face=\"arial, helvetica, sans-serif\">&nbsp;<\/font>  <font face=\"arial, helvetica, sans-serif\">Once Discovery is rolled-out once more to the launch pad, a third Tanking Test is expected to ensure the troubleshooting had eliminated the \u201cUnexplained<!--StartFragment --> Anomalies \u201d that currently remain from the first Tanking Test \u2013 which also included a&nbsp;<!--StartFragment -->LH2 tank diffuser problem.<\/font><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Shuttle Discovery won\u2019t be launched before July 18, according to one United Space Alliance (USA) source, with the next Tanking Test also delayed until next Tuesday. NASA has not officially announced the launch date slip. The slip in the Tanking Test \u2013 to be conducted on STS-114 before roll-back to the Vehicle Assembly Building (VAB)&nbsp; [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-42394","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42394"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=42394"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42394\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=42394"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=42394"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=42394"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}