{"id":42428,"date":"2005-03-31T20:08:09","date_gmt":"2005-03-31T12:08:09","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/rtf-wouldnt-have-happened-without-the-iss-kostelnik\/"},"modified":"2005-03-31T20:08:09","modified_gmt":"2005-03-31T12:08:09","slug":"rtf-wouldnt-have-happened-without-the-iss-kostelnik","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/rtf-wouldnt-have-happened-without-the-iss-kostelnik\/","title":{"rendered":"RTF wouldn\u2019t have happened without the ISS \u2013 Kostelnik"},"content":{"rendered":"<p>Deputy Associate Administrator for International Space Station and Space Shuttle Program Mike Kostelnik has told NASA\u2019s Integrated Space Operations Summit that the Return to Flight (RTF) of the Shuttle wouldn\u2019t have happened \u2013 had it not of been for the continued construction requirements of the International Space Station (ISS).\n<\/p>\n<p><font face=\"arial, helvetica, sans-serif\">Confirming the shut down of certain manufacturing elements for the Shuttle Program, Kostelnik noted a 28 flight mandate that will take the three Orbiters into a 2010 retirement.<\/font>  <font face=\"arial, helvetica, sans-serif\"><\/font>&nbsp;  <font face=\"arial, helvetica, sans-serif\">Following RTF test flights STS-114 (Discovery) and STS-121 (Atlantis) this year, NASA hopes to launch the Shuttle five times a year from 2006, finish the ISS, before moving on to a replacement vehicle \u2013 currently called the Crew Exploration Vehicle (CEV). <\/font>  <font face=\"arial, helvetica, sans-serif\"><\/font>&nbsp;  <font face=\"arial, helvetica, sans-serif\">The CEV \u2013 although doubtful to be near operational capacity by 2010 \u2013 is tasked with a diverse mandate of operations, with a potential to work in Low Earth Orbit, while also having the ability to transport astronauts to the Moon and Mars.<\/font>  <font face=\"arial, helvetica, sans-serif\">&nbsp;<\/font>  <font face=\"arial, helvetica, sans-serif\">First launched in 1981, the Space Shuttle could potentially continue operations long past 2010, but NASA appears set on simply using the fleet to fulfil commitments to the ISS and then retire the Orbiters. Had it of not been for the ISS, NASA say the Shuttle program would have ended with the loss of Columbia \u2013 and her crew of seven astronauts \u2013 in 2003.<\/font>  <font face=\"arial, helvetica, sans-serif\">&nbsp;<\/font>  <font face=\"arial, helvetica, sans-serif\">\u201cIf we did not have the ISS on orbit today we would not be returning (the Shuttle fleet) to flight,\u201d said Kostelnik,&nbsp;\u201cbut rather dedicating resources to next generation of exploration.\u201d<\/font>  <font face=\"arial, helvetica, sans-serif\">&nbsp;<\/font>  <font face=\"arial, helvetica, sans-serif\">Steps have already been taken in a phased shutdown of the supporting contracts that are central to the Shuttle Program. <\/font>  <font face=\"arial, helvetica, sans-serif\">&nbsp;<\/font>  <font face=\"arial, helvetica, sans-serif\">NASA is ending of the contract for the supply of Al-Li used to construct the&nbsp;External Tank (ET) \u2013 the largest of the non-reusable elements of the Space Transportation System \u2013 with enough of the material already in stock to complete the launch mandate.&nbsp;No more Solid Rocket&nbsp;Booster (SRB)&nbsp;canisters will be produced for the same reason, with orders for the SRB fuel, Aluminium Perchlorate, ending in 2008.<\/font>  <font face=\"arial, helvetica, sans-serif\">&nbsp;<\/font>  <font face=\"arial, helvetica, sans-serif\">The news comes just days before Shuttle Discovery is due to roll-out to launch pad B to prepare for RTF mission STS-114.<\/font><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Deputy Associate Administrator for International Space Station and Space Shuttle Program Mike Kostelnik has told NASA\u2019s Integrated Space Operations Summit that the Return to Flight (RTF) of the Shuttle wouldn\u2019t have happened \u2013 had it not of been for the continued construction requirements of the International Space Station (ISS). Confirming the shut down of certain [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-42428","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42428"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=42428"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42428\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=42428"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=42428"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=42428"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}