{"id":43468,"date":"2026-01-17T22:48:04","date_gmt":"2026-01-17T14:48:04","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/managers-on-alert-for-launch-fever-as-pressure-builds-for-nasas-moon-mission\/"},"modified":"2026-01-17T22:48:04","modified_gmt":"2026-01-17T14:48:04","slug":"managers-on-alert-for-launch-fever-as-pressure-builds-for-nasas-moon-mission","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/managers-on-alert-for-launch-fever-as-pressure-builds-for-nasas-moon-mission\/","title":{"rendered":"Managers on alert for \u201claunch fever\u201d as pressure builds for NASA\u2019s Moon mission"},"content":{"rendered":"<p>KENNEDY SPACE CENTER, Florida\u2014The rocket NASA is preparing for sending four astronauts on a trip around the Moon will emerge from its assembly building on Florida\u2019s Space Coast early Saturday for a slow crawl to its seaside launch pad.<\/p>\n<p style=\"\">Riding atop one of NASA\u2019s diesel-powered crawler transporters, the Space Launch System rocket and its mobile launch platform will exit the Vehicle Assembly Building at Kennedy Space Center around 7:00 am EST (11:00 UTC). The massive tracked transporter, certified by Guinness as the world\u2019s heaviest self-propelled vehicle, is expected to cover the four miles between the assembly building and Launch Complex 39B in about eight to 10 hours.<\/p>\n<p>The rollout marks a major step for NASA\u2019s Artemis II mission, the first human voyage to the vicinity of the Moon since the last Apollo lunar landing in December 1972. Artemis II will not land. Instead, a crew of four astronauts will travel around the far side of the Moon at a distance of several thousand miles, setting the record for the farthest humans have ever ventured from Earth.<\/p>\n<p>The flight will culminate with a scorching 25,000 mph (40,000 km\/h) reentry over the Pacific Ocean. The four Artemis II astronauts\u2014NASA\u2019s Reid Wiseman, Victor Glover, Christina Koch, and Canada\u2019s Jeremy Hansen\u2014will become the fastest humans in history, edging out a speed record set during the Apollo era of lunar exploration.<\/p>\n<h2>Origin story<\/h2>\n<p>The journey for the fully assembled Moon rocket will begin early Saturday at a slower pace. After leaving the Vehicle Assembly Building, the moving 11 million pound structure will head east, then make a left turn before climbing the ramp to Pad 39B overlooking the Atlantic Ocean.<\/p>\n<p>\u201cWe will be at a cruising speed of under 1 mile per hour,\u201d said Charlie Blackwell-Thompson, NASA\u2019s launch director for the Artemis II mission. \u201cIt\u2019ll be a little slower around the turns and up the hill.\u201d<\/p>\n<p>The crawler carrying the SLS rocket and Orion spacecraft was built 60 years ago to haul NASA\u2019s Saturn V rockets, then kept around for the Space Shuttle Program. Now, the vehicle is back to its original purpose of positioning Moon-bound rockets on their launch pads.<\/p>\n<p class=\"p1\">\u201cThese are the kinds of days that we live for when you do the kind of work that we do,\u201d said John Honeycutt, chair of NASA\u2019s Mission Management Team for the Artemis II mission. \u201cThe rocket and the spacecraft, Orion <em>Integrity<\/em>, are getting ready to roll to the pad\u2026 It really doesn\u2019t get much better than this, and we\u2019re making history.\u201d<\/p>\n<p>You can watch live views of the rollout in this YouTube stream provided by NASA.<\/p>\n<p><iframe loading=\"lazy\" title=\"YouTube video player\" src=\"https:\/\/www.youtube.com\/embed\/nrVnsO_rdew?si=zWVN-pnhlF4HIpQK\" width=\"678\" height=\"381\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\">\ufeff<\/iframe><\/p>\n<p>Artemis II is the first crew flight of NASA\u2019s Artemis program, an initiative named for the twin sister of Apollo in Greek mythology. NASA named the program Artemis in 2019, but some of the building blocks have been around for 20 years.<\/p>\n<p>,<\/p>\n<p>NASA selected Orion contractor Lockheed Martin to oversee the development of a deep space capsule in 2006 as part of the George W. Bush administration\u2019s soon-to-be canceled Constellation program. In 2011, a political bargain between the Obama administration and Congress revived the Orion program and kicked off development of the Space Launch System. The announcement of the Artemis program in 2019 leaned on work already underway on Orion and the SLS rocket as the centerpieces of an architecture to return US astronauts to the Moon.<\/p>\n<p>Tens of billions of dollars later, everything is finally coming together for the final, all-important milestone in developing the vehicles for transporting crews between the Earth and the Moon. A human-rated lunar lander and spacesuits tailored for Moonwalking astronauts are still a few years away from readiness. NASA has contracts with SpaceX and Blue Origin for landers, and with Axiom Space for suits.<\/p>\n<p>A successful Artemis II mission would demonstrate to NASA\u2019s managers and engineers that the Orion spacecraft and SLS rocket fulfill their roles in the Artemis architecture. NASA is expected to rely on the SLS rocket, which costs more than $2 billion per flight and is expendable by design, for several more missions until commercial alternatives are available.<\/p>\n<p>America\u2019s return to the Moon now has a geopolitical imperative. China is working to land its own astronauts on the lunar surface by 2030, and US officials want to beat the Chinese to the Moon for the motivation of national prestige and the material benefits of accessing lunar resources, among other reasons. For now, budget-writing lawmakers in Congress and President Donald Trump\u2019s new NASA chief, Jared Isaacman, agree the existing SLS\/Orion architecture, despite its cost and shortcomings, offers the surest opportunity to beat the Chinese space program to a crewed lunar landing.<\/p>\n<p>Then, if all goes according to plan, NASA can turn to cheaper (and in one case, more capable) rockets to help the government afford the expenditure required to construct a Moon base.<\/p>\n<p>,<\/p>\n<p class=\"p2\">\u201cPutting crew on the rocket and taking the crew around the Moon, this is going be our first step toward a sustained lunar presence,\u201d Honeycutt said. \u201cIt\u2019s 10 days [and] four astronauts going farther from Earth than any other human has ever traveled. We\u2019ll be validating the Orion spacecraft\u2019s life support, navigation, and crew systems in the really harsh environments of deep space, and that\u2019s going to pave the way for future landings.\u201d<\/p>\n<figure class=\"ars-wp-img-shortcode id-2136231 align-fullwidth\">\n<p>              <img width=\"2048\" height=\"1365\" src=\"https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2026\/01\/55044951821_b6179e69f2_k.jpg\" class=\"fullwidth full\" alt=\"\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2026\/01\/55044951821_b6179e69f2_k.jpg 2048w, https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2026\/01\/55044951821_b6179e69f2_k-640x427.jpg 640w, https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2026\/01\/55044951821_b6179e69f2_k-1024x683.jpg 1024w, https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2026\/01\/55044951821_b6179e69f2_k-768x512.jpg 768w, https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2026\/01\/55044951821_b6179e69f2_k-1536x1024.jpg 1536w, https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2026\/01\/55044951821_b6179e69f2_k-980x653.jpg 980w, https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2026\/01\/55044951821_b6179e69f2_k-1440x960.jpg 1440w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\"><\/p>\n<p>              NASA\u2019s 322-foot-tall (98-meter) SLS rocket inside the Vehicle Assembly Building on the eve of rollout to Launch Complex 39B.<\/p>\n<p>                  Credit:<br \/>\n                                      NASA\/Joel Kowsky<\/p>\n<\/figure>\n<p>There is still much work ahead before NASA can clear Artemis II for launch. At the launch pad, technicians will complete final checkouts and closeouts before NASA\u2019s launch team gathers in early February for a critical practice countdown. During this countdown, called a Wet Dress Rehearsal (WDR), Blackwell-Thompson and her team will oversee the loading of the SLS rocket\u2019s core stage and upper stage with super-cold liquid hydrogen and liquid oxygen propellants.<\/p>\n<p>The cryogenic fluids, particularly liquid hydrogen, gave fits to the Artemis launch team as NASA prepared to launch the Artemis I mission\u2014without astronauts\u2014on the SLS rocket\u2019s first test flight in 2022. Engineers resolved the issues and successfully launched the Artemis I mission in November 2022, and officials will apply the lessons for the Artemis II countdown.<\/p>\n<p class=\"p1\">\u201cArtemis I was a test flight, and we learned a lot during that campaign getting to launch,\u201d Blackwell-Thompson said. \u201cAnd the things that we\u2019ve learned relative to how to go load this vehicle, how to load LOX (liquid oxygen), how to load hydrogen, have all been rolled in to the way in which we intend to do for the Artemis II vehicle.\u201d<\/p>\n<h2>Finding the right time to fly<\/h2>\n<p>Assuming the countdown rehearsal goes according to plan, NASA could be in a position to launch the Artemis II mission as soon as February 6. But the schedule for February 6 is tight, with no margin for error. Officials typically have about five days per month when they can launch Artemis II, when the Moon is in the right position relative to Earth, and the Orion spacecraft can follow the proper trajectory toward reentry and splashdown to limit stress on the capsule\u2019s heat shield.<\/p>\n<p>In February, the available launch dates are February 6, 7, 8, 10, and 11, with launch windows in the overnight hours in Florida. If the mission isn\u2019t off the ground by February 11, NASA will have to stand down until a new series of launch opportunities, beginning March 6. The space agency has posted a document showing all available launch dates and times through the end of April.<\/p>\n<figure class=\"ars-wp-img-shortcode id-2136232 align-fullwidth\">\n<p>              <img width=\"1800\" height=\"1200\" src=\"https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2026\/01\/GettyImages-2255966880.jpg\" class=\"fullwidth full\" alt=\"\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2026\/01\/GettyImages-2255966880.jpg 1800w, https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2026\/01\/GettyImages-2255966880-640x427.jpg 640w, https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2026\/01\/GettyImages-2255966880-1024x683.jpg 1024w, https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2026\/01\/GettyImages-2255966880-768x512.jpg 768w, https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2026\/01\/GettyImages-2255966880-1536x1024.jpg 1536w, https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2026\/01\/GettyImages-2255966880-980x653.jpg 980w, https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2026\/01\/GettyImages-2255966880-1440x960.jpg 1440w\" sizes=\"auto, (max-width: 1800px) 100vw, 1800px\"><\/p>\n<p>              John Honeycutt, chair NASA\u2019s Mission Management Team for the Artemis II mission, speaks during a news conference at Kennedy Space Center in Florida on January 16, 2026.<\/p>\n<p>                  Credit:<br \/>\n                                      Jim Watson\/AFP via Getty Images<\/p>\n<\/figure>\n<p>NASA\u2019s leaders are eager for Artemis II to fly. NASA is not only racing China, a reality the agency\u2019s former administrator acknowledged during the Biden administration. Now, the Trump administration is pushing NASA to accomplish a human landing on the Moon by the end of his presidential term on January 20, 2029.<\/p>\n<p>One of Honeycutt\u2019s jobs as chair of the Mission Management Team (MMT) is ensuring all the Is are dotted and Ts are crossed amid the frenzy of final launch preparations. While the hardware for Artemis II is on the move in Florida, the astronauts and flight controllers are wrapping up their final training and simulations at Johnson Space Center in Houston.<\/p>\n<p>\u201cI think I\u2019ve got a good eye for launch fever,\u201d he said Friday.<\/p>\n<p class=\"p1\">\u201cAs chair of the MMT, I\u2019ve got one job, and it\u2019s the safe return of Reid, Victor, Christina, and Jeremy. I consider that a duty and a trust, and it\u2019s one I intend to see through.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>KENNEDY SPACE CENTER, Florida\u2014The rocket NASA is preparing for sending four astronauts on a trip around the Moon will emerge from its assembly building on Florida\u2019s Space Coast early Saturday for a slow crawl to its seaside launch pad. Riding atop one of NASA\u2019s diesel-powered crawler transporters, the Space Launch System rocket and its mobile [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":43471,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-43468","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/43468"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=43468"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/43468\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/43471"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=43468"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=43468"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=43468"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}