{"id":45801,"date":"2023-10-25T19:50:27","date_gmt":"2023-10-25T11:50:27","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/for-the-first-launch-of-ulas-vulcan-rocket-its-christmas-or-next-year\/"},"modified":"2023-10-25T19:50:27","modified_gmt":"2023-10-25T11:50:27","slug":"for-the-first-launch-of-ulas-vulcan-rocket-its-christmas-or-next-year","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/for-the-first-launch-of-ulas-vulcan-rocket-its-christmas-or-next-year\/","title":{"rendered":"For the first launch of ULA\u2019s Vulcan rocket, it\u2019s Christmas or next year"},"content":{"rendered":"<p>Three days at Christmastime will be the final chance for United Launch Alliance to get its new Vulcan rocket off the ground this year, the company\u2019s chief executive announced Tuesday.<\/p>\n<p style=\"\">Still waiting for delivery of an upper stage and a final round of qualification testing following a test mishap earlier this year, Tory Bruno, ULA\u2019s CEO, told CNBC on Tuesday that the Vulcan rocket\u2019s first demonstration flight is scheduled for launch December 24. There are two backup launch dates available December 25 and 26; otherwise, the launch will have to wait until January.<\/p>\n<p>If the Vulcan rocket\u2019s first flight happens on one of these dates, the launch will be at night, Bruno posted on the social media platform X.<\/p>\n<p>There are threats to this schedule, but ULA officials were confident enough in the timeline to publicly disclose the launch date Tuesday. They have also told Astrobotic, which is flying its first commercial Moon cargo lander on the inaugural Vulcan rocket, to ship its spacecraft from the company\u2019s Pittsburgh headquarters to Florida in anticipation of a December launch.<\/p>\n<p>\u201cWe need to finish building our upper stage and ship it down there (to Cape Canaveral),\u201d Bruno told CNBC. \u201cThere\u2019s some qualification testing in parallel. Both of those get done in November. The booster is already there ready to go, and the reason it\u2019s Christmas Eve is because of science, orbital mechanics.<\/p>\n<p>\u201cIf for some reason anything happens, bad weather, there\u2019s some delay in shipping the stage, we can move into January, where there\u2019s another similar window,\u201d Bruno said.<\/p>\n<h2>Tight launch windows<\/h2>\n<p>There are only a few days each month that the Vulcan rocket can take off. That\u2019s not the fault of ULA, but a constraint imposed by its payload. Astrobotic\u2019s robotic Peregrine lander will aim for landing at a region on the near side of the Moon known as the Gruithuisen Domes, the location of an ancient eruption of thick lava that solidified into steep rocky mounds.<\/p>\n<p>,<\/p>\n<p>Astrobotic wants to have good lighting at the landing site when it arrives, allowing the company\u2019s solar-powered Peregrine lander to return scientific data from a suite of NASA instruments.<\/p>\n<p>In February, United Launch Alliance\u2014a 50-50 joint venture between Boeing and Lockheed Martin\u2014announced May 4 as the target launch date for the first Vulcan rocket.<\/p>\n<p>But ULA soon scrapped that schedule after a test unit of the Vulcan rocket\u2019s Centaur upper stage exploded during a pressure test in Alabama in late March. ULA\u2019s launch team at Cape Canaveral, Florida, continued testing the Vulcan\u2019s first stage with a brief but flawless firing of its two Blue Origin-built main engines on the launch pad in June. Since then, the Vulcan launch campaign in Florida has been pretty much at a standstill.<\/p>\n<p>Engineers traced the cause of the Centaur explosion to a combination of higher-than-anticipated stress near the top of the liquid hydrogen propellant tank and slightly weaker welding. The upper stage designed for the Vulcan rocket is called the Centaur V. It\u2019s a wider, twin-engine version of the Centaur upper stage that has been reliably flying on several types of rockets since the 1960s.<\/p>\n<p>ULA sent the Centaur V upper stage that was already at Cape Canaveral for the first Vulcan launch back to the company\u2019s factory in Decatur, Alabama, for modifications to ensure it won\u2019t succumb to high pressures. It will fly on a future Vulcan mission, while the factory team brought forward another Centaur V, with additional stainless steel reinforcers on its forward dome, on the production line to fly on the first Vulcan rocket.<\/p>\n<p data-block-key=\"cs6q0\">\n<figure class=\"ars-img-shortcode id-1978379 align-center\">\n<p>                <img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"600\" src=\"https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2023\/10\/centaurv.jpeg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2023\/10\/centaurv.jpeg 800w, https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2023\/10\/centaurv-300x225.jpeg 300w, https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2023\/10\/centaurv-640x480.jpeg 640w, https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2023\/10\/centaurv-768x576.jpeg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\"><\/p>\n<p>                The completed Centaur V upper stage for the first Vulcan test flight, with modifications to resolve concerns about the strength of the forward dome of the hydrogen fuel tank.<\/p>\n<p>                    Credit:<br \/>\n                                          United Launch Alliance<\/p>\n<\/figure>\n<p>Earlier this month, Bruno posted on the social media platform X that ULA finished final assembly of the Centaur V upper stage for the inaugural Vulcan launch. Next up was a round of checks in a high-pressure test cell, installing insulation, and transport by boat from Alabama to Florida for launch preparations in November. At the launch site, ULA will lift the Centaur upper stage atop its already-in-place first stage, add two strap-on solid rocket boosters, and finally hoist the nose cone and payload on top of the launcher.<\/p>\n<p>,<\/p>\n<p>But that\u2019s not the whole story. In parallel, ULA is running another Centaur V upper stage through a repeat of the pressure testing that resulted in the explosion in March. In July, Bruno said ULA\u2019s engineers wanted to at least partially complete these checks, called qualification testing, to ensure the Centaur V upper stage can withstand the specific loads it will see on the first Vulcan mission. Later, ULA will complete the qualification testing through a range of different mission profiles, each with different structural stress levels, to make sure the upper stage can handle all of the Vulcan missions in ULA\u2019s backlog.<\/p>\n<p>ULA and its anchor customers\u2014the US military and Amazon\u2014are eager for the debut of the Vulcan rocket, which was originally supposed to fly in 2019. It will replace ULA\u2019s Atlas and Delta rockets, and the Pentagon chose it in 2020 to launch the majority of the military\u2019s national security space missions through 2027, with SpaceX\u2019s Falcon 9 and Falcon Heavy winning second place.<\/p>\n<p>SpaceX\u2019s rockets are flying with unprecedented regularity, while the Vulcan still hasn\u2019t gotten off the ground. ULA shuffled one of the military launch contracts originally assigned to Vulcan to fly instead on the Atlas V rocket, but there\u2019s a finite number of Atlas and Delta rockets left in ULA\u2019s inventory. They need Vulcan.<\/p>\n<h2>Go for shipment<\/h2>\n<p>Later this week, Astrobotic\u2019s lunar lander will depart Pittsburgh for the cross-country trip to a satellite processing facility near Cape Canaveral. There, technicians will perform final functional checks, fill the spacecraft with propellant for its landing engines, and remove covers from cameras and thrusters.<\/p>\n<p>\u201cWe\u2019re go for shipment this Friday,\u201d said Sharad&nbsp;Bhaskaran, Astrobotic\u2019s mission manager for the first Peregrine lander, which stands about 6 feet (1.9 meters) tall on its four landing legs.<\/p>\n<p>Founded in 2007, Astrobotic finished final testing on the Peregrine lander back in January, when ULA thought it had a chance to launch the Vulcan rocket in the spring. But until this week, Astrobotic never got the call from ULA to give the green light for shipping the spacecraft to the launch site.<\/p>\n<p>,<\/p>\n<p>\u201cIt has been a long, long time coming,\u201d John Thornton, Astrobotic\u2019s CEO, told Ars on Tuesday. \u201cWe\u2019re very excited that it\u2019s finally here, 16 years in the making, and now we\u2019re finally ready to ship to the launch site.<\/p>\n<figure class=\"ars-img-shortcode id-1978370 align-center\">\n<p>                <img loading=\"lazy\" decoding=\"async\" width=\"1500\" height=\"1000\" src=\"https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2023\/10\/astroboticpm1.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2023\/10\/astroboticpm1.jpg 1500w, https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2023\/10\/astroboticpm1-300x200.jpg 300w, https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2023\/10\/astroboticpm1-640x427.jpg 640w, https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2023\/10\/astroboticpm1-768x512.jpg 768w, https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2023\/10\/astroboticpm1-980x653.jpg 980w, https:\/\/cdn.arstechnica.net\/wp-content\/uploads\/2023\/10\/astroboticpm1-1440x960.jpg 1440w\" sizes=\"(max-width: 1500px) 100vw, 1500px\"><\/p>\n<p>                Astrobotic\u2019s Peregrine lander at the company\u2019s Pittsburgh headquarters.<\/p>\n<p>                    Credit:<br \/>\n                                          Astrobotic<\/p>\n<\/figure>\n<p>This mission is one of the first two commercial Moon landers to fly under the banner of NASA\u2019s Commercial Lunar Payload Services (CLPS) program, which began in 2018 with the purpose of buying commercial transportation to the Moon for the agency\u2019s scientific instruments. The CLPS program, in many ways, is a precursor to the Artemis program to return humans to the surface of the Moon.<\/p>\n<p>NASA awarded Astrobotic a $79.5 million contract in 2019 to arrange for delivery of its scientific instruments to the Moon on the Peregrine lander. Astrobotic also has another CLPS contract with NASA for a Moon landing with a larger spacecraft scheduled for late 2024.<\/p>\n<p>Intuitive Machines, a Houston-based company, recently&nbsp;completed its Nova-C lander for launch later this year on a SpaceX Falcon 9 rocket. Like Astrobotic, Intuitive Machines aims to ferry NASA payloads to the Moon\u2019s surface under a contract won through the CLPS program.<\/p>\n<p>Astrobotic and Intuitive Machines are vying to achieve the first successful soft landing of a US spacecraft on the Moon since the last Apollo mission in 1972. Both won their NASA contracts in 2019 and initially hoped to launch in 2021. Now, it turns out both should be ready at about the same time.<\/p>\n<p>\u201cUltimately, the timing of both our launches is somewhat aligning,\u201d Bhaskaran said. \u201cIt\u2019s going to be fun to watch Intuitive Machines, and it\u2019s going to be fun, as well, to see our mission get off the ground and then of course, hopefully, make a successful landing.\u201d<\/p>\n<p>Assuming the Vulcan rocket flies around Christmas, it will place the Astrobotic lander into a high-altitude orbit, where it will make one loop around Earth before intercepting the Moon a quarter-million miles from Earth around 15 days after liftoff, Bhaskaran said.<\/p>\n<p>\u201cThen we\u2019ll go into lunar orbit, and then proceed to orbital operations before we commence our landing sequences,\u201d he said.<\/p>\n<p><em>Oct. 25, 2023: This story was updated with additional comments from Tory Bruno about launch time.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Three days at Christmastime will be the final chance for United Launch Alliance to get its new Vulcan rocket off the ground this year, the company\u2019s chief executive announced Tuesday. Still waiting for delivery of an upper stage and a final round of qualification testing following a test mishap earlier this year, Tory Bruno, ULA\u2019s [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":45803,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[697,625,190,750,4518],"class_list":["post-45801","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-astrobotic","tag-moon","tag-nasa","tag-united-launch-alliance","tag-vulcan-rocket"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/45801"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=45801"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/45801\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/45803"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=45801"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=45801"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=45801"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}