{"id":70480,"date":"2016-07-19T22:39:33","date_gmt":"2016-07-19T14:39:33","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/how-ssl-plans-to-turbocharge-its-satellite-manufacturing-strategy\/"},"modified":"2016-07-19T22:39:33","modified_gmt":"2016-07-19T14:39:33","slug":"how-ssl-plans-to-turbocharge-its-satellite-manufacturing-strategy","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/how-ssl-plans-to-turbocharge-its-satellite-manufacturing-strategy\/","title":{"rendered":"How SSL Plans to Turbocharge its Satellite Manufacturing Strategy"},"content":{"rendered":"<\/p>\n<p>[Via Satellite 07-19-2016] <strong>Space Systems Loral <\/strong>(SSL) is taking a multi-year program to streamline operations and optimize the satellite manufacturing process, and turning it into a continuous state of being, according to Executive Vice President of Engineering and Operations Paul Estey. The company has been pursuing an ongoing comprehensive effort to shorten timelines for satellite production \u2014 while avoiding quality shortfalls or introducing mistakes \u2014 in an effort to both stay competitive among other manufacturers and to enable satellite operators to compete more effectively with terrestrial telecommunications providers.<\/p>\n<p>\u201cWe started it in earnest in August of 2014,\u201d Estey told <em>Via Satellite<\/em>. \u201cWe\u2019ve been working on it feverishly for two years and we don\u2019t see an end in sight. This is a continuous improvement effort that we have inside the company.\u201d<\/p>\n<p>Estey described this optimization program as split into two main categories.<\/p>\n<p>\u201cThere is some technology, but it\u2019s also the procurement approach to how satellites are architected, designed, built and tested,\u201d he said.<\/p>\n<p>Estey mentioned SSL optimizing its test program to weed out workmanship problems, and employing time-saving methods like limiting testing on reused structures when the design has already been vetted multiple times. He also mentioned using a more automated system to expedite documentation.<\/p>\n<p>\u201cThat isn\u2019t really technology, that\u2019s just being smart. We are trying to be intelligent in how we design, build and deliver these satellites,\u201d he said.<\/p>\n<p>The technological half includes processes like increased use of additive manufacturing and automation. Estey said SSL has invested a significant amount of money into automation and has many people working on this effort. The result, he said, is better schedule integrity, enabling the company to deliver satellites on time or early. SSL is pursuing a record number of satellite launches this year. So far, five SSL-produced satellites have launched and eight more are scheduled for missions by the end of the year. Estey said the onus is now on launch providers to stay on track.<\/p>\n<p>Along with this optimization effort, Estey said SSL is also continuing to invest in new technologies such as high throughput technology, low-mass rollout solar arrays, and electric propulsion. SSL received its first award for an all-electric satellite this year from <strong>Eutelsat<\/strong> for its Eutelsat 7C. Estey said it is hard to predict if more all-electric orders will follow, but he does expect hybrid electric-chemical systems to gain further popularity.<\/p>\n<p>\u201cHybrid is more than half of our satellites right now,\u201d he said, adding that SSL has 23 hybrid electric propulsion spacecraft operating today. \u201cI see more and more of that. We have very few solely bipropellant systems now; most have electric involved.\u201d<\/p>\n<p>Estey believes Q\/V band technology may eventually go mainstream as operators seek means to create higher capacity systems. Earlier this year SSL did a demonstration of Q\/V with Eutelsat that Estey said worked as planned. Such Extremely High Frequency (EHF) systems could enable future terabit-level satellite broadband services.&nbsp;[contextly_sidebar id=\u201d5dZ69pv8gXQjaN5J86eSXkpZkVZqHGDo\u201d]<\/p>\n<p>SSL is also seeing greater demand for digital payloads, something Estey described as potentially paving the way for more standardized satellites.<\/p>\n<p>\u201cDigital payloads are clearly coming into play more and more, and that plays into our notion of trying to standardize our platform and our payloads as much as possible. Digital allows us to do that because the customization becomes, to some degree, software, and a little less on the hardware side,\u201d he said.<\/p>\n<p>Standardized platforms are appealing because they could eventually lead to satellites being pre-built before operators purchase them, and then defined by software on-orbit. Estey also mentioned a <strong>NASA <\/strong>Tipping Point program with SSL to develop an on-orbit robotic assembly capability that could further revolutionize they way satellites are procured and operated. SSL is developing robotic systems based on the heritage of its parent company <strong>MacDonald, Dettwiler and Associates <\/strong>(MDA) to construct reflectors in space.<\/p>\n<p>\u201cThat can lead into on orbit assembly of all sorts of things if you really put your imagination to it,\u201d Estey explained. \u201cIt could be antenna systems, payloads, even moving toward the idea of the persistent platform, where we have a long duration bus and add and subtract payloads as you move along. This creates a quicker refresh rate of new generation payloads. This is in the early stages \u2014 not something that will happen in the next five years, likely, but it is a very exciting area of engineering endeavor for us.\u201d<\/p>\n<p>SSL\u2019s initial program with NASA is a ground demonstration. The next stage for this technology will be to get it into orbit and demonstrate it on a commercial satellite.<\/p>\n<\/p>\n<figure id=\"attachment_237455\" aria-describedby=\"caption-attachment-237455\" style=\"width: 300px\" class=\"wp-caption alignright\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-237455\" src=\"https:\/\/www.satellitetoday.com\/wp-content\/uploads\/2016\/07\/BRI-101-003-approved-300x200.jpg\" alt=\"SSL PT. Bank Rakyat Indonesia BRIsat\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.satellitetoday.com\/wp-content\/uploads\/2016\/07\/BRI-101-003-approved-300x200.jpg 300w, https:\/\/www.satellitetoday.com\/wp-content\/uploads\/2016\/07\/BRI-101-003-approved-768x513.jpg 768w, https:\/\/www.satellitetoday.com\/wp-content\/uploads\/2016\/07\/BRI-101-003-approved-1024x683.jpg 1024w, https:\/\/www.satellitetoday.com\/wp-content\/uploads\/2016\/07\/BRI-101-003-approved-900x601.jpg 900w, https:\/\/www.satellitetoday.com\/wp-content\/uploads\/2016\/07\/BRI-101-003-approved.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\"><figcaption id=\"caption-attachment-237455\" class=\"wp-caption-text\">BRIsat in SSL\u2019s antenna test facility. SSL completed BRIsat on schedule in 23 months for PT. Bank Rakyat Indonesia. Photo: SSL<\/figcaption><\/figure>\n<\/p>\n<p>Estey said SSL is finding a lot of interest in Low Earth Orbit (LEO) systems as well. This year the company received orders for eight LEO spacecraft \u2014 six for <strong>Terra Bella<\/strong>, one from <strong>Telesat<\/strong> and one from an unnamed customer.<\/p>\n<p>\u201cWe are supporting some of the NewSpace companies here in Silicon Valley \u2014 of which there are quite a few \u2014 trying to get them up and running, which is exciting for a lot of our engineers,\u201d said Estey.<\/p>\n<p>In geostationary telecom orders, SSL received two this year \u2014 Intelsat 39 for <strong>Intelsat<\/strong> and the aforementioned Eutelsat 7C for Eutelsat. Estey said SSL is getting \u201ca good number\u201d of Requests for Information (RFIs), along with Requests for Proposals (RFPs) that the company is responding to, but that it remains difficult to predict which orders will go through.<\/p>\n<p>\u201cWe have a lot of interest and a good number of RFPs, [but] that doesn\u2019t mean people will necessarily order. I think there has been more proposal activity in the first half of this year compared with the last half of last year. But in the last year or so the procurement process has dragged on, so we don\u2019t know if things will drag into 2017 or be awarded in 2016. It is still hard to tell,\u201d he explained.<br \/>\nLast year was a slow year for geostationary telecom orders. <strong>Northern Sky Research <\/strong>(NSR) analyst Carolyn Belle told <em>Via Satellite <\/em>the research firm counted 19 commercial orders in 2015, compared to 28 in 2014 and 26 the year before. She noted however, that 2011 and 2012 were both below 20, like 2015.<\/p>\n<p>Estey said the reason does not appear related to <strong>Ex-Im Bank<\/strong>, which, despite being reauthorized, remains unable to finance most satellite projects due to an incomplete board of directors. He said operators instead are scrutinizing their business plans to ensure they are making the right investments. SSL, he said, is sheltered from some of the fallout related to Ex-Im Bank because its owner is based in Canada, thus giving the company access to <strong>Export Development Canada <\/strong>(EDC) as an alternative source of Export Credit Agency (ECA) funding. However, MDA leadership has, in the past, bemoaned Ex-Im Bank\u2019s absence as negatively impacting SSL.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[Via Satellite 07-19-2016] Space Systems Loral (SSL) is taking a multi-year program to streamline operations and optimize the satellite manufacturing process, and turning it into a continuous state of being, according to Executive Vice President of Engineering and Operations Paul Estey. The company has been pursuing an ongoing comprehensive effort to shorten timelines for satellite [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":63892,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-70480","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/70480"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=70480"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/70480\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/63892"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=70480"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=70480"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=70480"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}