{"id":72001,"date":"2016-02-05T19:50:49","date_gmt":"2016-02-05T11:50:49","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/cpi-asc-signal-division-supplying-antennas-for-2016-olympic-coverage\/"},"modified":"2016-02-05T19:50:49","modified_gmt":"2016-02-05T11:50:49","slug":"cpi-asc-signal-division-supplying-antennas-for-2016-olympic-coverage","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/cpi-asc-signal-division-supplying-antennas-for-2016-olympic-coverage\/","title":{"rendered":"CPI ASC Signal Division Supplying Antennas for 2016 Olympic Coverage"},"content":{"rendered":"<\/p>\n<p>[Via Satellite 02-05-2016] The <b>ASC Signal Division of Communications &amp; Power Industries <\/b>(CPI) has won a contract for eight multi-band antennas for coverage of the 2016 Rio de Janeiro Olympic Games and other regional sports broadcasts for a major Latin American broadcast network. The contract includes one 7.6-meter dual C- and Ku-band transmit\/receive antenna and seven 4.5-meter antennas configured with a mix of capabilities.&nbsp;Brazilian integrator <b>Seal Broadcast &amp; Content <\/b>will install the antennas.<\/p>\n<p>All of the antennas are equipped with the Next-Generation Controller (NGC) from CPI ASC Signal Division, which lets operators control and operate multiple antenna systems from a single device. The NGC has remote access and tracking capabilities built into the system, an internal spectrum analyzer, redundancy control systems, and many other high-performance controller features.<\/p>\n<p>The 2016 Summer Olympic Games, the first slated to occur in Latin America, kick off in Rio de Janeiro on Aug. 5. The city has invested more than $100 billion in infrastructure and transportation to support the games as well as the World Cup played there in 2015.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[Via Satellite 02-05-2016] The ASC Signal Division of Communications &amp; Power Industries (CPI) has won a contract for eight multi-band antennas for coverage of the 2016 Rio de Janeiro Olympic Games and other regional sports broadcasts for a major Latin American broadcast network. The contract includes one 7.6-meter dual C- and Ku-band transmit\/receive antenna and [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":70217,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-72001","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/72001"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=72001"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/72001\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/70217"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=72001"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=72001"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=72001"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}