{"id":82272,"date":"2012-10-23T00:59:07","date_gmt":"2012-10-22T16:59:07","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/raytheon-executive-outlines-10-month-development-plan-to-fab-t-cdr\/"},"modified":"2012-10-23T00:59:07","modified_gmt":"2012-10-22T16:59:07","slug":"raytheon-executive-outlines-10-month-development-plan-to-fab-t-cdr","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/raytheon-executive-outlines-10-month-development-plan-to-fab-t-cdr\/","title":{"rendered":"Raytheon Executive Outlines 10-Month Development Plan to FAB-T CDR"},"content":{"rendered":"<p>[Satellite News 10-22-12] After submitting a proposal for an alternate Family of Advanced Beyond Line of Sight Terminals (FAB-T) program to the Pentagon this past summer, <b>Raytheon<\/b> was awarded its long-sought-after FAB-T development tract contract in September, under which the company will work to provide secure, anti-jam communications for the U.S. president and senior military advisers.<\/p>\n<p>&nbsp; &nbsp;The award stems back to 2002, when the <b>U.S. Air Force<\/b> awarded <b>Boeing<\/b> a contract to develop FAB-T systems that would work with the AEHF satellites. The program experienced several hiccups and spent 10 years in development, leading to several cost overruns that forced the military to issue a Request For Proposal (RFP) in April for alternative solutions as a risk mitigation effort.<br \/>\n&nbsp; &nbsp;Since 2002, Raytheon has won three separate contracts for similar terminals, all of which were upgrade contracts or new start programs that would introduce AEHF terminals to three different branches of the U.S. military. The AEHF military terminals that Raytheon currently produces already meet 80 percent of the Air Force\u2019s requirements.<br \/>\n&nbsp; &nbsp;Raytheon Network Centric Systems Vice President of Integrated Communication Systems Scott Whatmough spoke to <i>Satellite News<\/i> about how his company plans to meet its development milestones during the next six months to a year since winning the FAB-T development tract last month.<br \/>\nWhatmough said that the first milestone Raytheon must meet the contract is to get to a critical design review (CDR) within 10 months of signing the contract, which gives the company until July 10, 2013.<br \/>\n&nbsp; &nbsp;\u201cThis is not a typical CDR where we\u2019re starting with a clean piece of paper, as we are already starting with an 80 percent solution that has already completed the most difficult work \u2013 the advanced AEHF waveform and logging onto the satellite,\u201d said Whatmough. \u201cWhat we\u2019re really doing is a CDR on the 20 percent that we didn\u2019t already have fully functioning.\u201d<br \/>\n&nbsp; &nbsp;Raytheon previously achieved technology milestones on two high-priority civil space and government satellite projects in November 2011, when its Army Secure Mobile Anti-jam Reliable Tactical Terminal (SMART-T) became the first operationally fielded terminal to interoperate with the in-orbit Advanced Extremely High Frequency (AEHF) satellite. The company recently completed its set of operational tests after the launch of the first AEHF satellite in August 2010.<br \/>\n&nbsp;&nbsp; SMART-T AEHF, which is both fielded and in production, already demonstrated interoperable communications using the AEHF satellite\u2019s eXtended Data Rate (XDR) waveform. Raytheon said the XDR moved data more than five times faster than previous EHF systems. The company also demonstrated backward compatibility to low- and medium-data-rate operation supported by earlier EHF satellites on the new AEHF satellite. Raytheon also successfully tested its U.S. Navy Multiband Terminal (NMT) with the AEHF satellite in December 2011.<br \/>\n&nbsp; &nbsp;\u201cBecause of the benefit we\u2019ve had on SMART-T, NMT and NMPU, all three of those systems have already been on satellite and have successfully completed all of their testing,\u201d said Whatmough. \u201cWe can now take that capability and then add to it the Air Force specific capabilities required for FAB-T, which are interfaces required for specific protocols that the Air Force would use in taking Presidential National Voice Conferencing (PNVC) capability from SMART-T and porting it into the FAB-T baseline.\u201d<br \/>\n&nbsp; &nbsp;Raytheon must also demonstrate those capabilities as part of the remaining 20 percent of the FAB-T requirement due by July 2013. \u201cWe haven\u2019t picked the exact week that we will hold those demonstrations, but it\u2019s conjunction with the CDR, so it\u2019s at the end of that 10-month window that ends in the July timeframe,\u201d Whatmough said. \u201cWe also will be showing the hardware that we will have adapted in the configuration required to be in an airborne platform, which is different than the configuration for the Humvee-mounted SMART-T, or the ship-mounted NMT.\u201d<br \/>\n&nbsp; &nbsp;Raytheon\u2019s FAB-T development tract deal provides full funding for this development work. Whatmough noted that the contract contains provisions to continue development work through a full 24-month period. \u201cThis allotted time gets us through a full qualification of the hardware and production-ready systems,\u201d he said. \u201cThe expectation is that we will continue on that development path and show complete continuity from start to finish. All of this is geared toward the Air Force\u2019s need for a September 2015 launch of a fully functioning FAB-T terminal. That is an important date for the Air Force.\u201d<br \/>\n&nbsp; &nbsp;The FAB-T development deal also contained no contractual relationships or requirements to work with Boeing, according to Whatmough. \u201cOur offering was based on our existing capabilities and not dependent on anything that was done on the original FAB-T contract,\u201d he said. \u201cThis allows complete autonomy and it allows the Air Force to have an honest, competitive environment.\u201d<br \/>\n&nbsp; &nbsp;While admitting that a normal program of this complexity would not be able to establish the kind of maturity that the Air Force would want in a risk reduction program in just 10 months, Whatmough said he had no worries about the work ahead. \u201cThere\u2019s nothing involved with this program that keeps me awake,\u201d he said. \u201cWe\u2019re fully confident that we\u2019ll get the job done. &nbsp;We are fully staffed with engineers and personnel that will allow us to meet these deadlines. We are right on track.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[Satellite News 10-22-12] After submitting a proposal for an alternate Family of Advanced Beyond Line of Sight Terminals (FAB-T) program to the Pentagon this past summer, Raytheon was awarded its long-sought-after FAB-T development tract contract in September, under which the company will work to provide secure, anti-jam communications for the U.S. president and senior military [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-82272","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/82272"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=82272"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/82272\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=82272"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=82272"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=82272"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}