{"id":84493,"date":"2011-07-26T20:13:29","date_gmt":"2011-07-26T12:13:29","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/gmv-to-provide-turksats-new-ground-segment-network\/"},"modified":"2011-07-26T20:13:29","modified_gmt":"2011-07-26T12:13:29","slug":"gmv-to-provide-turksats-new-ground-segment-network","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/gmv-to-provide-turksats-new-ground-segment-network\/","title":{"rendered":"GMV to Provide Turksat\u2019s New Ground Segment Network"},"content":{"rendered":"<p>[07-26-11] Spanish space company <b>GMV<\/b> will develop the ground segment for Turkish satellite operator <b>Turksat\u2019s<\/b> 4A and 4B satellites under a 5 million euro ($7.24 million) subcontract issued July 26 by <b>Mitsubishi Electronics<\/b>.<br \/>\n&nbsp;&nbsp; &nbsp; The contract will see GMV supply its Hifly satellite monitoring and control product and its FocusGEO flight dynamics system for orbit control. Integrated with other components of the ground segment, the two GMV systems will be installed in a main control center and in the emergency center located in Ankara, Turkey. A system replica also will be installed at Mitsubishi Electronics to facilitate satellite integration and validation tasks. GMV also will manage the migration of the flight dynamics system of Turksat\u2019s whole fleet to FocusGEO to ensure a uniform control procedure for all the satellites.<br \/>\n&nbsp;&nbsp; &nbsp; Turksat 4A and 4B are scheduled for launch in late 2013 by International Launch Services (ILS) on a Proton rocket. The satellites aim to allow Turksat to offer telecommunications and television services throughout Turkey, Europe, Central Asia, the Middle East and Africa. Both satellites will be based on Mitsubishi Electronics\u2019 DS2000 platform. Turksat 41 will be placed in the 42 degrees East orbital slot and Turksat 5B will be placed at the 50 degrees East slot.<br \/>\n&nbsp;&nbsp; &nbsp; GMV Aerospace General Manager Jorge Potti said the company\u2019s T\u00fcrksat and Mitsubishi contracts were important milestones in GMV\u2019s expansion efforts, consolidating the company\u2019s strategic policy of providing its clients with a complete solution for ground-segment projects.<br \/>\n&nbsp;&nbsp; &nbsp;\u201cWe will work with Turksat\u2019s prime contractor Mitsubishi to take on complete responsibility for setting up the satellite ground segment, including on-site deployment and integration and training tests for Turksat\u2019s operators and engineers to familiarize them with the supplied system,\u201d said Potti. \u201cThis contract award is a great satisfaction to us as it broadens our portfolio of clients with an operator of the importance of T\u00fcrksat and a major space systems manufacturer like Mitsubishi Electronics.\u201d<br \/>\n&nbsp;&nbsp; &nbsp;Turksat currently uses <b>Intelsat<\/b> capacity to serve the Middle East region under a contract signed in March 2010. The agreement provided Turksat with satellite capacity it needed while it finalized details of its new satellites.<br \/>\n&nbsp;&nbsp; &nbsp;Turksat Director General \u00c5\u0090zkan Dalbay told <i>Satellite News<\/i> that the launch of Turksat 3A would put the operator in a good position to boost overall revenues. \u201cWith the additional capacity of Turksat 3A, we expect a 30 percent increase in our revenues over the next 12 months. From the satellite services perspective, there is certainly a growing market not only from government organizations, but also from non-governmental companies.\u201d<br \/>\n&nbsp;&nbsp; The contract also is a major step in Mitsubishi Electric\u2019s plan to increase its annual satellite sales to $1.87 billion by March 2021 and double its annual satellite production capacity from four satellites to eight. In June, the Japanese company announced that it would invest about $37.4 million to upgrade its Kamakura Works production facility in Kamakura, Japan to meet its ambitious long-term goals. Mitsubishi officials said the facility would be complete by March 2013.<br \/>\n&nbsp;&nbsp; \u201cOur new facility will help us reduce costs and shorten delivery time by integrating production processes, component assembly and environmental testing. The enlarged facility will have a total floor space of 7,700 square-meters when it is finished in 2013,\u201d the company said in a statement. \u201cThe annual demand for new satellites in the global commercial communications market has risen to about 20, due to the rapid increase in traffic for data and telecommunications.\u201d<br \/>\n&nbsp;&nbsp; The company said its growth plan was driven by the Japanese Government\u2019s 2009 Basic Plan for Space Policy, which stated that the country\u2019s development and production of satellites should be utilization-driven rather than research and development-driven. The company\u2019s most recent launch came in May, when its ST-2 communications satellite was successfully placed into geostationary orbit for a joint venture between SingTel and Chunghwa Telecom.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[07-26-11] Spanish space company GMV will develop the ground segment for Turkish satellite operator Turksat\u2019s 4A and 4B satellites under a 5 million euro ($7.24 million) subcontract issued July 26 by Mitsubishi Electronics. &nbsp;&nbsp; &nbsp; The contract will see GMV supply its Hifly satellite monitoring and control product and its FocusGEO flight dynamics system for [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-84493","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/84493"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=84493"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/84493\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=84493"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=84493"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=84493"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}