{"id":87021,"date":"2010-05-04T01:35:53","date_gmt":"2010-05-03T17:35:53","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/isro-postpones-polar-satellite-launch-vehicle-mission\/"},"modified":"2010-05-04T01:35:53","modified_gmt":"2010-05-03T17:35:53","slug":"isro-postpones-polar-satellite-launch-vehicle-mission","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/isro-postpones-polar-satellite-launch-vehicle-mission\/","title":{"rendered":"ISRO Postpones Polar Satellite Launch Vehicle Mission"},"content":{"rendered":"<p>[05-03-10] The <strong>Indian Space Research Organisation <\/strong>(ISRO) delayed the launch of its Polar Satellite Launch Vehicle (PSLV-C15), initially scheduled for May 9, the organization announced April 30. <br \/>\n&nbsp;&nbsp;&nbsp; ISRO detected a marginal drop in the pressure in the second stage of the vehicle during mandatory checks. The new date for the launch of PSLV-C15 mission will be decided after analyzing the data.<br \/>\nThe delay follows a series of mishaps for ISRO. On April 15, ISRO\u2019s GSLV-D3 rocket carrying the GSAT-4 communications satellite failed due to a third-stage engine malfunction that resulted in total loss of control of the spacecraft. In August, ISRO\u2019s $82 million unmanned Chandrayaan-1 mission ended after ISRO lost contact with the spacecraft.<br \/>\n&nbsp;&nbsp;&nbsp; The PSLV will carry India`s Cartosat-2B, Algeria\u2019s Alsat-2A, nanosatellites NLS 6.1 and NLS 6.2 from the University of Toronto, and Studsat, a satellite built by students from academic institutions in Karnataka and Andhra Pradesh in India.<\/p>\n<h2>Related Stories-<\/h2>\n<p>\n<b class=\"titlelink\">SES Hopes to Bounce Back after Tough Start in 2010<\/b>&nbsp;<img loading=\"lazy\" decoding=\"async\" align=\"top\" width=\"12\" height=\"14\" src=\"..\/..\/..\/..\/images\/icon_lock.gif\" alt=\"\">&nbsp;&nbsp; \t\t\tSatellite News&nbsp;&nbsp; \t\t\tApril 26, 2010<br \/>\n[04-26-10] SES registered a  tough first quarter, as issues such as the delay of the launch of the  Astra 3B satellite, the future of ND SatCom and technical problems with  the AMC-16 satellite, could cost the operator up to 13 million\u2026<\/p>\n<p><b class=\"titlelink\">ISRO Cryogenic Launch Fails; GSAT-4 Lost<\/b>&nbsp;&nbsp; \t\t\tSatellite Today&nbsp;&nbsp; \t\t\tApril 16, 2010<br \/>\n[04-16-10] The launch of  Indian Space Research Organization s (ISRO) GSLV-D3 rocket carrying the  GSAT-4 communications satellite has failed due to a third-stage engine  malfunction that resulted in total loss of control of the\u2026<\/p>\n<p><b class=\"titlelink\">ISRO Completes S-200 Booster Static Firing Test<\/b>&nbsp; \t\t \t\t\t&nbsp;  \t\t\tSatellite Today&nbsp;&nbsp; \t\t\tJanuary 26, 2010<br \/>\n[01-25-10] The Indian Space  Research Organization (ISRO) has successfully conducted a static test of  the S-200, India s largest solid rocket booster, ISRO announced Jan.  25. The S-200, part of ISRO s GSLV-Mk 3 geosynchronous\u2026<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[05-03-10] The Indian Space Research Organisation (ISRO) delayed the launch of its Polar Satellite Launch Vehicle (PSLV-C15), initially scheduled for May 9, the organization announced April 30. &nbsp;&nbsp;&nbsp; ISRO detected a marginal drop in the pressure in the second stage of the vehicle during mandatory checks. The new date for the launch of PSLV-C15 mission [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-87021","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/87021"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=87021"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/87021\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=87021"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=87021"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=87021"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}