{"id":87606,"date":"2010-01-25T21:13:46","date_gmt":"2010-01-25T13:13:46","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/viasat-wins-14-4-million-mids-jtrs-limited-production-order\/"},"modified":"2010-01-25T21:13:46","modified_gmt":"2010-01-25T13:13:46","slug":"viasat-wins-14-4-million-mids-jtrs-limited-production-order","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/viasat-wins-14-4-million-mids-jtrs-limited-production-order\/","title":{"rendered":"ViaSat Wins $14.4 Million MIDS JTRS Limited Production Order"},"content":{"rendered":"<p>[01-25-10] <strong>ViaSat<\/strong> has been awarded a $14.4 million limited production order from the <strong>U.S. Department of Defense<\/strong> for Multifunctional Information Distribution System Joint Tactical Radio System (MIDS JTRS) terminals, the company announced Jan. 21.  <br \/>\n&nbsp;&nbsp;&nbsp; ViaSat will produce 41 terminals for the<strong> U.S. Space and Naval Warfare Systems Command<\/strong> (SPAWAR) under the MIDS indefinite delivery, indefinite quantity contract awarded in January 2000. The MIDS JTRS terminals are for F\/A-18E\/F and E-8C aircraft and spares.  <br \/>\n&nbsp;&nbsp;&nbsp; The MIDS JTRS program was implemented as an enhancement to the current MIDS low-volume terminal (MIDS-LVT). MIDS JTRS has completed contractor qualification testing and initial F\/A-18E\/F integration in anticipation of operational testing later this year.  <br \/>\n&nbsp;&nbsp;&nbsp; Pre-production terminals have been undergoing flight tests for several months. The MIDS JTRS terminal completed security verification testing and is in the final stages of obtaining NSA certification. ViaSat expects to receive conditional first article approval in February.<\/p>\n<h2>Related Stories-<\/h2>\n<p>\n<b class=\"titlelink\">ViaSat Receives $4.8 Million MIDS-LVT Military  Terminal Order<\/b>&nbsp;&nbsp; \t\t\tSatellite Today&nbsp;&nbsp; \t\t\tJanuary 14, 2010<br \/>\n[01-14-10] ViaSat received an  order valued at about $4.8 million from the U.S. Department of Defense  for Multifunctional Information Distribution System (MIDS-LVT)  terminals, the company announced Jan. 13.<\/p>\n<p><b class=\"titlelink\">ViaSat, Innotech Aviation Install Ku-band Airborne  Broadband Terminal<\/b>&nbsp;&nbsp; \t\t\tSatellite Today&nbsp;&nbsp; \t\t\tOctober 21, 2009<br \/>\n[10-21-09] ViaSat Inc. and  airborne terminal reseller Innotech Aviation completed the first  installation of a ViaSat VMT-1500 airborne broadband terminal on a  Bombardier Global Express XRS aircraft, the manufacturer announced  Oct\u2026<\/p>\n<p><b class=\"titlelink\">ViaSat Awarded $21 Million Military Low-Volume  Terminal Order<\/b>&nbsp;&nbsp; \t\t\tSatellite Today&nbsp;&nbsp; \t\t\tJuly 2, 2009<br \/>\n[07-02-09] ViaSat won a  delivery order worth about $21 million for Multifunctional Information  Distribution System (MIDS) terminals from U.S. Space and Naval Warfare  Systems Command in San Diego, ViaSat announced July 1.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[01-25-10] ViaSat has been awarded a $14.4 million limited production order from the U.S. Department of Defense for Multifunctional Information Distribution System Joint Tactical Radio System (MIDS JTRS) terminals, the company announced Jan. 21. &nbsp;&nbsp;&nbsp; ViaSat will produce 41 terminals for the U.S. Space and Naval Warfare Systems Command (SPAWAR) under the MIDS indefinite delivery, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-87606","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/87606"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=87606"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/87606\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=87606"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=87606"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=87606"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}