{"id":88128,"date":"2009-11-11T19:22:16","date_gmt":"2009-11-11T11:22:16","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/lockheed-martin-hits-sbirs-geo-testing-milestones\/"},"modified":"2009-11-11T19:22:16","modified_gmt":"2009-11-11T11:22:16","slug":"lockheed-martin-hits-sbirs-geo-testing-milestones","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/lockheed-martin-hits-sbirs-geo-testing-milestones\/","title":{"rendered":"Lockheed Martin Hits SBIRS GEO Testing Milestones"},"content":{"rendered":"<p>The second Space-Based Infrared System (SBIRS) geosynchronous orbit (GEO-2) spacecraft is progressing through a series of tests that will demonstrate the integrated satellite\u2019s readiness to enter the critical environmental test phase in preparation for launch, the spacecraft\u2019s manufacturer <strong>Lockheed Martin<\/strong> announced Oct. 29.<br \/>\n&nbsp;&nbsp;&nbsp; Lockheed Martin is under contract by the <strong>U.S. Air Force<\/strong> to develop and manufacture the system, designed to provide early warning of missile launches, and simultaneously support other missions including missile defense, technical intelligence and battlespace characterization.<br \/>\n&nbsp;&nbsp;&nbsp; \u201cThis is yet one more step towards providing revolutionary missile warning capabilities to the warfighters and national decision makers in the coming years,\u201d Air Force Lt. Col Heath Collins said in a statement.<br \/>\n&nbsp;&nbsp;&nbsp; The first SBIRS spacecraft (GEO-1) is in thermal vacuum testing, the last environmental test phase prior to final checkout and shipment to the launch site in late 2010.<\/p>\n<h2>Related Stories-<\/h2>\n<p>\n<b class=\"titlelink\">L-3 to Provide GPS 3 Satellite Test Software to Lockheed Martin<\/b>&nbsp;&nbsp; \t\t\tSatellite Today&nbsp;&nbsp; \t\t\tOctober 23, 2009<br \/>\n[10-23-09] L-3 Telemetry-West (L-3 TW), a division of L-3 Communications, has been contracted by Lockheed Martin Space Systems to supply a command, control, communications, and monitor (C3M) system for use in factory testing on the\u2026<\/p>\n<p><b class=\"titlelink\">Lockheed Martin Space Systems Drives Growth in Third Quarter<\/b>&nbsp;&nbsp; \t\t\tSatellite Today&nbsp;&nbsp; \t\t\tOctober 21, 2009<br \/>\n[10-21-09] Lockheed Martin s space systems business unit has driven growth for the company in its third financial quarter of 2009, offsetting losses suffered due to U.S. military spending cutbacks, Lockheed Martin announced in its\u2026<\/p>\n<p><b class=\"titlelink\">Lockheed Martin Names New President and COO<\/b>&nbsp;&nbsp; \t\t\tSatellite Today&nbsp;&nbsp; \t\t\tOctober 16, 2009<br \/>\n[10-16-09] Lockheed Martin s board named Christopher Kubasik president and COO effective Jan. 1, the company announced Oct. 15. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>The second Space-Based Infrared System (SBIRS) geosynchronous orbit (GEO-2) spacecraft is progressing through a series of tests that will demonstrate the integrated satellite\u2019s readiness to enter the critical environmental test phase in preparation for launch, the spacecraft\u2019s manufacturer Lockheed Martin announced Oct. 29. &nbsp;&nbsp;&nbsp; Lockheed Martin is under contract by the U.S. Air Force to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-88128","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/88128"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=88128"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/88128\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=88128"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=88128"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=88128"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}