{"id":91258,"date":"2026-10-27T00:41:50","date_gmt":"2026-10-26T16:41:50","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/blue-origin-rebuilds-new-glenn-launch-tower-targets-november-pad-return\/"},"modified":"2026-10-27T00:41:50","modified_gmt":"2026-10-26T16:41:50","slug":"blue-origin-rebuilds-new-glenn-launch-tower-targets-november-pad-return","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/blue-origin-rebuilds-new-glenn-launch-tower-targets-november-pad-return\/","title":{"rendered":"Blue Origin Rebuilds New Glenn Launch Tower, Targets November Pad Return"},"content":{"rendered":"<p>The work centered on the Vehicle Access Tower at SLC-36, which supports launches of the New Glenn rocket. Blue Origin CEO Dave Limp confirmed the tower&#8217;s completion in an October 24 statement, marking the end of a rebuild and repair effort on the structure.<\/p>\n<p>Limp wrote that the Vehicle Access Tower is fully assembled, with every module repaired and back in place. The 430-ft. tower is the launch infrastructure at Cape Canaveral&#8217;s SLC-36 that will support New Glenn operations. Blue Origin is on track to resume pad operations in November, advancing the vehicle&#8217;s flight campaign following the earlier phase of operations.<\/p>\n<p>The return to the pad signals renewed cadence for Blue Origin&#8217;s heavy-lift rocket. New Glenn is the company&#8217;s entry into the heavy-lift market, and the resumption of pad operations advances its flight campaign.<\/p>\n<p>A November target gives Blue Origin a concrete calendar marker for returning New Glenn to the pad and rebuilding its launch tempo.<\/p>\n<p>Attention now turns to the resumption of pad operations at SLC-36 in November, the next named milestone in the New Glenn flight campaign.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The work centered on the Vehicle Access Tower at SLC-36, which supports launches of the New Glenn rocket. Blue Origin CEO Dave Limp confirmed the tower&#8217;s completion in an October 24 statement, marking the end of a rebuild and repair effort on the structure. Limp wrote that the Vehicle Access Tower is fully assembled, with [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":91259,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-91258","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/91258"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=91258"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/91258\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/91259"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=91258"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=91258"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=91258"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}