{"id":91406,"date":"2026-10-28T22:57:16","date_gmt":"2026-10-28T14:57:16","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/ntias-500-mhz-mandate-is-its-top-job-patrick-says\/"},"modified":"2026-10-28T22:57:16","modified_gmt":"2026-10-28T14:57:16","slug":"ntias-500-mhz-mandate-is-its-top-job-patrick-says","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/ntias-500-mhz-mandate-is-its-top-job-patrick-says\/","title":{"rendered":"NTIA\u2019s 500 MHz Mandate Is Its Top Job, Patrick Says"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><em>By Nick David, Editorial Lead, SatNews<\/em><\/p>\n<p class=\"wp-block-paragraph\">Five hundred megahertz. That\u2019s how much federal spectrum Congress has told NTIA to find for commercial use, and it is now the agency\u2019s top job.<\/p>\n<p class=\"wp-block-paragraph\">Scott Patrick, executive director of the National Telecommunications and Information Administration\u2019s Office of Spectrum Management, laid out the work Tuesday on the \u201cRegulators as Capacity Allocators\u201d panel at Silicon Valley Space Week\u2019s Satellite Innovation track, moderated by Brian Weimer, partner and space and satellite practice leader at Sheppard. The One Big Beautiful Bill Act, signed into law in July 2025, directs NTIA to identify 500 MHz of federal spectrum between 1.3 GHz and 10.5 GHz for reallocation or sharing with commercial users. At least 200 MHz is due by July 2027, and the full amount by July 2029.<\/p>\n<p class=\"wp-block-paragraph\">\u201cThat is a big chunk of spectrum, 500 MHz, and it\u2019s a lot of work, and there was a tight deadline,\u201d Patrick said. Because the statute requires it, he said, the work is NTIA\u2019s primary job right now, and \u201cother things might not be getting as much attention.\u201d<\/p>\n<h2 class=\"wp-block-heading has-text-color\" style=\"color:var(--sn-heading)\">The easiest lifts first<\/h2>\n<p class=\"wp-block-paragraph\">Every federal band costs money to clear, so NTIA is starting with the cheapest. \u201cWe want to tackle the easiest lift possible,\u201d Patrick said.<\/p>\n<p class=\"wp-block-paragraph\">He pointed to the 7 GHz band, where the incumbents are mostly point-to-point microwave links, which he said are not as difficult to relocate. He also named the 1675\u20131695 MHz band, which he said \u201chas been teed up for a long time.\u201d Some candidate bands predate the law. For others, NTIA informally sounded out federal agencies and potential stakeholders before settling on them, he said.<\/p>\n<p class=\"wp-block-paragraph\">Karl Kensinger, special counsel in the FCC\u2019s Space Bureau, laid out the division of labor on the same panel. The FCC licenses commercial stations, NTIA coordinates and assigns spectrum for federal systems, and in shared bands the two agencies coordinate individual licenses.<\/p>\n<h2 class=\"wp-block-heading has-text-color\" style=\"color:var(--sn-heading)\">The FCC side: more bands on the table<\/h2>\n<p class=\"wp-block-paragraph\">Kensinger said the commission is taking a more open look at new frequencies for satellites. Its Spectrum Abundance proceedings cover \u201ca large number of bands that, in my experience, 15 years ago would\u2019ve been considered off limits,\u201d he said.<\/p>\n<p class=\"wp-block-paragraph\">He also cited the FCC\u2019s use of authorizations under No. 4.4 of the ITU Radio Regulations. These let operators use frequencies ahead of a formal allocation as long as they cause no interference and claim no protection. Updating the 25-year-old limits that protect geostationary satellites from non-geostationary transmissions, he added, can increase usable capacity \u201cby a tremendous factor.\u201d<\/p>\n<p class=\"wp-block-paragraph\">For satellite operators waiting on other federal-band work, the first checkpoint is July 2027, when NTIA must have its first 200 MHz identified.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>By Nick David, Editorial Lead, SatNews Five hundred megahertz. That\u2019s how much federal spectrum Congress has told NTIA to find for commercial use, and it is now the agency\u2019s top job. Scott Patrick, executive director of the National Telecommunications and Information Administration\u2019s Office of Spectrum Management, laid out the work Tuesday on the \u201cRegulators as [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-91406","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/91406"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=91406"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/91406\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=91406"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=91406"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=91406"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}