Author: starpathwp-production
-

Why NASA delayed Artemis 1 launch (again) and what happens next
Another leak brings SLS to its knees After leaks in a quick disconnect on Monday, Saturday’s separate leak shows that additional work will be needed to ensure the rocket is ready to fly. Hydrogen is a pesky fuel to work with – it’s the smallest molecule on the periodic table, and when it’s being pushed…
-

Hydrogen leak delays moonshot by at least several weeks
STORY WRITTEN FOR CBS NEWS & USED WITH PERMISSION NASA’s Space Launch System moon rocket on Launch Complex 39B on Saturday, following a scrubbed launch attempt due to a hydrogen leak. Credit: NASA NASA’s star-crossed Space Launch System moon rocket was grounded for the second time in five days Saturday, this time by a large hydrogen leak…
-

Watch the first launch of NASA’s SLS Moon rocket on Artemis 1
If you’re looking to get as close as possible to SLS, the bus tours offered by the Kennedy Space Center visitor complex are the way to do it. There’s both an admission fee and an additional fee for the Explore bus tours, but the KSCVC offers a look at space, past and present, at Kennedy…
-

Live coverage: NASA to conduct Artemis 1 repair work at the launch pad
Live coverage of the countdown and maiden flight of the Space Launch System on NASA’s Artemis 1 mission. Text updates will appear automatically below; there is no need to reload the page. Follow us on Twitter. [tabby title=”SFN Live”] [tabby title=”Sept. 3 launch attempt”] [tabbyending]
-

NASA scrubs second try to launch moon rocket due to persistent hydrogen leak
An overhead view shows the Orion spacecraft atop the Space Launch System rocket. (NASA via YouTube) NASA called off today’s attempt to launch its Space Launch System rocket due to a hydrogen leak encountered during the process of fueling up the core stage. Mission managers said they’d have to pass up the current opportunity for…
-

SLS teams scrub second launch attempt for Artemis I as hydrogen leaks persist
NASA has scrubbed the second launch attempt of the Artemis I mission from the Kennedy Space Center in Florida after a liquid hydrogen (LH2) leak was detected at the vehicle-to-ground interface on the LH2 Tail Service Mast Umbilical (TSMU). This was the fourth time teams loaded liquid hydrogen on the vehicle, and the fourth time…
-

Thales to Provide SpaceGate Ground Solution to Eutelsat for Konnect VHTS
Thales Alenia Space will provide its SpaceGate ground connectivity solution to Eutelsat for the Konnect VHTS satellite. SpaceGate is a satellite access network solution designed to provide wideband connectivity to increase ground segment performance. It is composed of baseband equipment to be deployed in the Eutelsat ground stations as well as terminals for internet connectivity. …
-

Airbus discusses technical aspects of the European Service Module
The European Service Module (ESM) is part of the necessary hardware to bring people back to the moon. It will not only be used to power Orion on the Artemis I mission, but on the missions to come as well. In the first interview, NASASpaceflight had the opportunity to talk with Kai Bergemann, Deputy Programme…
-

Italian microsatellite promises orbital photo bonanza after Artemis 1 launch
Artist’s illustration of the ArgoMoon spacecraft with the SLS moon rocket’s interim cryogenic propulsion stage. Credit: ASI Italian engineers are expecting a series of spectacular photos from a tiny satellite that will be released to fly in sync with the interim cryogenic propulsion stage that propels the Orion capsule and European service module to the…
-

Eutelsat Begins Search for New CFO as Sandrine Téran Steps Down
Eutelsat will be looking for a new CFO as Sandrine Téran, who has been CFO for more than five years, is stepping down from the role. Eutelsat announced the update Sept. 2. The operator said Téran will step down by the end of November to “pursue other professional endeavors.” The recruitment process of a successor…