Author: starpathwp-production
-

E-Space Hires New CFO and Chief Satellite Systems Engineer
Djuran, left. Murarka, right. Photos: E-Space Greg Wyler-founded startup E-Space has added to its executive team, hiring Gunjan Murarka as CFO and Dalibor Djuran as chief satellite systems engineer. Murarka joins E-Space from smallsat manufacturer LeoStella, where he was also CFO. He previously worked at Microsoft, Amazon, and Siemens Communications. At E-Space, Murarka will be…
-

T-Mobile and SpaceX get set to announce ‘something special’ for Starlink connectivity
An artist’s conception shows Starlink satellites in orbit. (SpaceX Illustration) FOLLOW-UP: T-Mobile’s coverage will get a big boost from SpaceX’s Starlink satellites, starting with texts The CEOs of SpaceX and T-Mobile will join forces on Thursday to reveal how their companies will work together to increase wireless connectivity. Details about the announcement, set to be…
-

Kuaizhou-1A, Chang Zheng 2D launches highlight busy China week in spaceflight
The Chinese space sector has been very busy this year, averaging approximately one orbital launch attempt per week. This week was no exception, with two successful launches taking place from different parts of China. The Kuaizhou-1A (KZ-1A) and Chang Zheng 2D rockets carried out one mission each, with KZ-1A lofting the Chuangzin-16 payload to orbit…
-

FCC Commissioner Carr Says Starlink RDOF Decision ‘Exceeds’ Agency Authority
FCC Commissioner Brendan Carr further criticized the agency’s recent decision to strike funding for SpaceX’s Starlink constellation as part of the Rural Digital Opportunity Fund (RDOF), saying the decision “plainly exceeds agency authority.” Carr was an immediate critic of the decision when it was announced on Aug. 10, and issued a further statement on Wednesday,…
-

Speedcast Signs Deals With Bristow Group, Algeria’s ATS
Speedcast recently signed deals with aviation services provider Bristow Group and Algerian satellite services provider Algérie Télécom Satellite (ATS). Bristow Group signed a multi-year contract to upgrade more than 40 onshore energy and search and rescue office bases with Speedcast’s Unified Global Platform (UGP) and software-defined wide area network (SD-WAN) solution, which is multi-path and…
-

Thursday Morning Conversation with ST Engineering iDirect’s Koen Willems
Hear from ST Engineering iDirect’s Head of Global Government Strategy, Koen Willems, as he talks to Mark Holmes about how New Ground and its key technology innovations will benefit next-generation GOVSATCOM and MILSATCOM networks. Learn about the six different stages in the evolution from a traditional satellite network to a modern New Ground satellite network.…
-

Terran Orbital Delivers LunIR Satellite to NASA For Artemis 1 Launch
Terran Orbital Corporation, one of the global leaders in satellite solutions, primarily serving the United States and Allied aerospace and defense industries, has delivered LunIR to Complex 39B at NASA’s Kennedy Space Center. LunIR is a 6U satellite that will fly by the Moon and collect surface thermography as a secondary payload on Artemis 1…
-

Following in the footsteps of Saturn, SLS prepares for test flight
As NASA’s Space Launch System (SLS) rocket stands ready for its first test flight next week, the Artemis program prepares to follow in the footsteps of Apollo, which first carried humans to the Moon in the 1960s. SLS will fly uncrewed just once before carrying astronauts around the Moon on Artemis II, while the Orion…
-

TMYTEK Introduces mmWave Antenna-in-Package Solutions for 5G and SATCOM Applications
TMYTEK has introduced a one-stop AiP design service to fulfill different antenna system requirements for various applications, from the ground, maritime, and air communication. The design capabilities support SATCOM, 5G/B5G to 6G that covers a dozen GHz to one hundred GHz frequencies, and antenna elements from small scale 8×8 up to large matrix 64×64 and…
-

SpaceX teams refining countdown procedures for Starship testing
In recent weeks, SpaceX has not only moved back into Starship testing with Ship 24, but has also performed multiple engine tests with Booster 7 after the explosion below it during a failed spin prime test, and repairs after that in the mega bay. It is now time to look at parts of the countdown…