Tag: Artemis 1
-

SLS Core Stage thermal protection system refurbishment in work at Kennedy for Artemis 1
NASA’s Space Launch System (SLS) and Exploration Ground Systems (EGS) programs are working with Core Stage prime contractor Boeing and prime test operations and support contractor Jacobs to finish repairs to thermal protection system (TPS) spray-on foam insulation on the Artemis 1 Core Stage at the Kennedy Space Center in Florida. The TPS foam, cork,…
-

SLS Core Stage Green Run validates propulsion system performance and modeling
Engineers with NASA’s Space Launch System (SLS) program and prime Core Stage contractor Boeing continue to review terabytes of data from the now-complete, once-in-a-generation Green Run design verification test campaign. A series of eight test cases were completed, culminating in a 500-second long, full-duration static firing of the stage in the B-2 Test Stand at…
-

NASA EGS, Jacobs preparing SLS Core Stage for Artemis 1 stacking
The Core Stage of NASA’s first Space Launch System (SLS) vehicle arrived at the Kennedy Space Center (KSC) and was moved into the Vehicle Assembly Building (VAB) on April 29. The stage is now in the hands of KSC’s Exploration Ground System (EGS) program and prime test operations and support contractor (TOSC) Jacobs. The long-awaited…
-

Ten month schedule to ready SLS for Artemis 1 launch after Core Stage arrives at KSC
NASA’s Exploration Ground Systems (EGS) program is looking at a wide range of forecasts for when they can complete testing necessary to be ready to launch Artemis 1. The Core Stage of NASA’s first Space Launch System (SLS) vehicle arrived at the Kennedy Space Center and was moved into the Vehicle Assembly Building (VAB) on…
-

Core of NASA’s first Artemis moon rocket towed into Vehicle Assembly Building
The 212-foot-long core stage for the Artemis 1 mission rolls into the Vehicle Assembly Building Thursday at NASA’s Kennedy Space Center in Florida. Credit: Stephen Clark / Spaceflight Now A decade in the making, the core stage for NASA’s first Space Launch System heavy-lift rocket rolled into the Vehicle Assembly Building at the Kennedy Space…
-

NASA barge delivers first SLS core stage to Kennedy Space Center
NASA’s Pegasus barge arrives in the Turn Basin at the Kennedy Space Center Tuesday evening. Credit: Steven Young / Spaceflight Now The core stage of NASA’s first Space Launch System heavy-lift rocket arrived at the Kennedy Space Center on Tuesday evening aboard a specially-built barge, completing a voyage by sea from a test site in…
-

SLS core ready for shipment to Florida; NASA still hopes for late 2021 launch
Teams at NASA’s Stennis Space Center in Mississippi hoist the Space Launch System core stage out of the B-2 test stand April 19 after a hot fire test March 18. Credit: NASA Teams at Stennis Space Center in Mississippi removed the core of NASA’s first Space Launch System heavy-lift rocket from a test stand earlier…
-

Our interview with Steve Jurczyk, NASA’s acting administrator
Stephen Clark, Spaceflight Now’s editor, asked NASA’s acting administrator about the space agency’s commercial crew and Artemis programs during a one-on-one virtual interview Tuesday, April 20. Email the author. Follow Stephen Clark on Twitter: @StephenClark1.
-

NASA SLS Green Run testing complete, Boeing readies Core Stage for tow to Florida
NASA’s Space Launch System (SLS) program and prime Core Stage contractor Boeing wrapped up the Green Run testing campaign on the Artemis 1 flight article at the Stennis Space Center and are readying the vehicle for its long-awaited shipment to the Kennedy Space Center (KSC) in Florida. After reviewing the performance of the vehicle from…
-

Aerojet Rocketdyne refurbishing RS-25 engines for Artemis 1 launch and production restart testing
With the completion of another single-engine RS-25 development test, Aerojet Rocketdyne is now refurbishing five engines at the Stennis Space Center in Mississippi for their next use. After the second test firing of the Retrofit 2 series in the A-1 Test Stand on April 6, development engine 0528 is going through a streamlined refurbishment prior…