Tag: Artemis II
-

While Artemis II schedule remains uncertain, NASA EGS preparing to be ready and waiting for stacking
At the Kennedy Space Center (KSC), NASA’s Exploration Ground Systems (EGS) program continues to prepare for the Artemis II circumlunar mission that was recently delayed to September 2025. EGS is finishing certification of new ground systems to support crewed launches of the agency’s Orion spacecraft with its Space Launch System (SLS) rocket beginning with Artemis…
-

Boeing ramps up final assembly to complete Artemis II SLS Core Stage by year end
Following a cost-saving summer slowdown, NASA Space Launch System (SLS) Core Stage prime contractor Boeing is again working two shifts a day at the Michoud Assembly Facility (MAF) in New Orleans to complete final testing and checkout of the unit that will help send NASA astronauts back to the Moon on the Artemis II mission.…
-

Rocket Report: European rockets finally fly; Artemis II core stage issues
Welcome to Edition 6.15 of the Rocket Report! We’re now more than three-quarters of the way through the year, and as of Thursday, there have been 156 orbital launches since January 1. Last year, which set a record for global launch activity, we didn’t reach 156 orbital launches until mid-November. At the cadence set so…
-

SLS working to overcome supply chain, weld issues to complete Artemis II Core Stage this year
NASA is now planning for the Space Launch System (SLS) core stage assigned to the Artemis II lunar flyby mission to be completed in mid-December for subsequent delivery to its Kennedy Space Center (KSC) launch site. The four RS-25 core stage engines were installed in the stage in September at the Michoud Assembly Facility (MAF)…
-

Rocket Report: Iran launches satellite; Artemis II boosters get train ride
Welcome to Edition 6.13 of the Rocket Report! While SpaceX waits for regulatory approval to launch the second full-scale test flight of its Super Heavy booster and Starship rocket, NASA’s contractors took two steps forward this week to prepare for the second launch of the government-owned Space Launch System on the Artemis II mission, which…
-

Lack of SLS rockets limit NASA Artemis manifest
NASA and its advisory bodies remain concerned about the low flight rate planned for its crewed Orion spacecraft and Space Launch System (SLS) rocket, but the space agency doesn’t have enough vehicles to fly more often this decade. Hardware to launch only two more SLS vehicles is available until development of the Exploration Upper Stage…
-

Artemis II crew visits Bremen, as Germany signs the Artemis Accords
ESA and Airbus, in coordination with NASA, hosted an Artemis II media event at the Airbus facility in Bremen, Germany, on Friday, Sept. 15. In this event, the whole crew of Artemis II was present at the facility where Airbus assembles the Orion European Service Module (ESM). The ESM will provide life support and propulsion…
-

RS-25 engine installation into the Artemis II SLS Core Stage begins
Aerojet Rocketdyne, an L3Harris Technologies Company, is helping install four of its RS-25 liquid-propellant rocket engines in NASA’s second Space Launch System (SLS) core stage at the agency’s Michoud Assembly Facility (MAF) in New Orleans. The beginning of installation of the upgraded former Space Shuttle Main Engines (SSME) in Core Stage-2 at MAF on Sept.…
-

NASA modifies ML-1 for Artemis II, ML-2 under construction for SLS Block IB
As construction begins to assemble the Mobile Launcher-2 (ML-2) for Artemis IV, Mobile Launcher-1 (ML-1) secured its position once again back on top of Launch Complex 39B for pad validation and testing. This comes after ML-1 spent the better part of this year undergoing repairs and upgrades outside of the VAB at the West Park…
-

Final ICPS arrives in Florida for Artemis III SLS launch
United Launch Alliance (ULA) delivered the last-ever Space Launch System (SLS) Interim Cryogenic Propulsion Stage (ICPS) from its Decatur, Alabama, factory to Cape Canaveral Space Force Station (CCSFS) in early August for eventual use on the Artemis III lunar landing mission. ICPS-3 was also the last Delta hardware to depart Decatur and will support NASA’s…