Tag: Artemis
-

Ship 37 completes a Spin Prime test following Engine Swap
The target launch date for Flight 10 is one step closer after the retest of Ship 37, which followed an engine change after the ship completed a pair of static fires on Pad 1 (A). Additionally, Booster 16 has been rolled to the rocket garden as it awaits its companion to be ready for flight.…
-

NASA takes a trip to Seattle area to thank suppliers for work on the next moonshot
NASA astronaut Woody Hoburg faces the TV cameras at L3Harris’ Aerojet Rocketdyne facility in Redmond, Wash. An R-4D-11 thruster and a decontamination oven are off to his left. (GeekWire Photo / Alan Boyle) REDMOND, Wash. — The first crewed flight around the moon in more than 50 years is still months away, but NASA is…
-

Artemis II astronauts discuss mission status ahead of in-capsule training
Scheduled to launch in February 2026, the Artemis II Orion capsule and Space Launch System (SLS) rocket are currently at Kennedy Space Center in Florida for final integration and stacking. The Artemis II astronauts — comprised of NASA astronauts Reid Wiseman, Victor Glover, Christina Koch, and Canadian Space Agency astronaut Jeremy Hansen — recently spoke…
-

The Final Two Block 2 Ships leave Mega Bay 2 for Testing
Following the loss of Ship 36 during its static fire test campaign at Masseys on June 18, SpaceX has been trying to recover, rebuild, and proceed with the last two Block 2 ships it has for flight. These are Ship 37 and Ship 38, and this week, both vehicles rolled out for respective testing before…
-

Boeing updates EUS progress via thrust structure render
Boeing is expected to spend 2.8 billion dollars on NASA’s brand-new Exploration Upper Stage (EUS), which is set to ride with the Space Launch System Block 1B version of the rocket, and this week showed off part of its hardware, or at least a render of it. See Also ML-2 Updates SLS Forum Section Click…
-

Final ML-2 tower module added as Artemis and SLS Block 1B receive a funding reprieve
Mobile Launcher 2 (ML-2), the launch tower and platform to be used by the Block 1B variant of the Space Launch System (SLS), recently had its tenth and final tower module stacked on July 2. Module 10 will support the Orion crew access arm and related systems, and its installation brings the ML-2 tower’s height…
-

Starship at Cape Canaveral making progress as SpaceX tries to push the program forward
While SpaceX continues to attempt to launch flight tests at Starbase, crews are working diligently to bring the next several pads and the next production facility online. Roberts Road and LC-39A have seen significant progress, while demolition of SLC-37 continues. Roberts Road Over the past several months, SpaceX has been significantly expanding its operations at…
-

With Masseys out of commission, SpaceX may attempt static fire Ships at the launch site
With the Ship static fire stand and trench at Masseys out of commission, SpaceX appears to be attempting a path toward static firing a Ship on Pad 1 (A). There are numerous elements to this plan, and it’s not the first time SpaceX has attempted to use a pad for a different vehicle. If successful,…
-

Northrop Grumman tests SLS Block 2 BOLE booster in Utah; nozzle issue seen
Northrop Grumman conducted the first test firing of its Booster Obsolescence and Life Extension (BOLE) five-segment solid rocket motor at its Promontory production and test site in Utah. The Development Motor 1 (DM-1) fired Thursday, June 26, at 12:25 PM MDT (18:25 UTC) and lasted for close to two minutes and 20 seconds, burning over…
-

Following the Loss of Ship 36, SpaceX now Focuses on Rebuilding Masseys
Following the loss of Ship 36 at Masseys and the cleanup operations now underway, SpaceX must rebuild the static fire stand. While crews work towards this goal, progress on Pad B continues, along with the development of next-generation hardware. Masseys, Ship 36, and the Path Forward See Also SpaceX Starship Program L2 SpaceX Section NSF…