Tag: CCP
-

NASA announces test flight crew change for Boeing’s Starliner
Just five months after revealing the NASA astronauts who will fly the crewed test flights for both SpaceX’s Dragon and Boeing’s Starliner missions, NASA announced today that a medical issue will prevent one of those astronauts from flying the Starliner crewed test flight. The announcement came via the agency’s website, noting that Eric Boe, a…
-

Falcon 9 with Dragon 2 rolls out for DM-1 dry dress rehearsal at 39A
The SpaceX Falcon 9 and Crew Dragon capsule which will execute the Demonstration Mission-1 (DM-1) test flight have rolled out to Pad 39A for fit checks ahead of launch. The rollout is a strong indicator that SpaceX is nearly ready to perform the much anticipated DM-1 mission – an uncrewed certification flight for NASA’s Commercial…
-

Commercial Crew completes training and prepares flight hardware
Teams from NASA, SpaceX, and the Department of Defense recently completed medical emergency training at Cape Canaveral. Launch pads are receiving final upgrades, and flight hardware is beginning to arrive, as both Commercial Crew providers progress towards returning crew launch capability to American soil. On October 25, an emergency simulation was conducted at the Kennedy…
-

Thirty years after Return To Flight from Challenger, Commercial Crew strives for culture of safety
Thirty years ago this weekend, after a two and a half year stand down and an extremely difficult external- and self-examination of a lack of safety within the program, NASA succeeded in returning the Space Shuttle fleet to flight following the devastating loss of the Space Shuttle Challenger and her seven-member crew on the STS-51L…
-

NAC provides Starliner, Dragon 2 update – Commercial Crew preps entering final leg to launch
SpaceX and Boeing continue to make steady progress towards the major flight tests under NASA’s Commercial Crew Program. At a NASA Advisory Council (NAC) meeting on Monday, the members were updated on the progress of each of the two providers. Overall, the updates were quite positive with most of the flight hardware nearing completion. The…
-

Boeing’s Ferguson on Starliner – no touch screens, but far simpler than Shuttle
Chris Ferguson, Director of Crew and Mission Operations for Boeing and a former NASA astronaut, has outlined Starliner’s design and what Boeing and NASA have planned for the uncrewed and crewed test flights. The former Shuttle commander also spoke about how much simpler Starliner’s displays will be in comparison to the orbiters. Working on a…
-

SpaceX readies for installation of LC-39A Crew Access Arm, previews Crew Dragon
Just two weeks after the announcement of the NASA astronauts who will fly the company’s DM-2 and Crew-1 flights, SpaceX has provided more information and access to the Crew Dragon and now stands ready to install the Crew Access Arm – through which astronauts will board Dragon – at LC-39A at the Kennedy Space Center.…
-

Commercial Crew assignments; NASA nears goal of human space transport innovation
An announcement most have waited years for. NASA has officially announced the flight assignments for the first crewed test and operational flights of SpaceX’s Dragon and Boeing’s Starliner crew transportation vehicles. The announcements come as the Commercial Crew Program gears up for the uncrewed and crewed test flights of the first commercially developed vehicles that…
-

ASAP reviews Boeing failure, positive SpaceX success ahead of Commercial Crew announcement
As NASA prepares to provide updated launch date targets for the uncrewed and crewed Commercial Crew demonstration missions from both SpaceX and Boeing – as well as flight crew assignments for each provider – the agency’s Aerospace Safety Advisory Panel (ASAP) held its quarterly meeting last Thursday, during which they outlined a failure on Boeing’s…
-

US Spacewalkers Feustel and Arnold complete EVA double
Expedition 55 Flight Engineers Drew Feustel and Ricky Arnold stepped outside of the International Space Station for the second of two related EVAs, completing the primary objectives of upgrading cooling system hardware and installing new and updated communications equipment for future dockings of commercial crew spacecraft. The first spacewalk (EVA-50) was completed last month ahead…