Tag: EM-1
-

EGS Integration Console engineers review Artemis I campaign
The NASA Exploration Ground Systems (EGS) program is continuing to review the experiences from the Artemis I launch campaign as teams plan and prepare for Artemis II in a couple of years. History suggested there would be a long ground campaign to the Space Launch System’s (SLS) first liftoff, and a series of issues —…
-

NASA flight software for SLS navigates through clean first launch
The NASA-developed flight software for the agency’s Space Launch System (SLS) vehicle successfully flew the program’s first launch on the Artemis I mission on Nov. 16. The vehicle’s Integrated Avionics and Software conducted the final countdown and first eight minutes of launch, commanding the Core Stage, RS-25 engines, and Solid Rocket Boosters (SRB) to orbital…
-

“Alexa, turn on the lights”; Lockheed Martin, Amazon, Cisco test virtual assistant, deep space video conferencing
With the Orion spacecraft soaring through its mission with flying colors so far, the capsule will soon enter its Distant Retrograde Orbit of the Moon with significant tests of various capsule and service module systems progressing. Inside Orion, in addition to the myriad of experiments and technology demonstrations, teams from Lockheed Martin, Amazon, and Cisco…
-

SLS makes successful debut flight, sending Artemis I to the Moon
NASA and the SLS teams have successfully launched the agency’s super heavy lift rocket which will facilitate humanity’s return to the Moon: this time to establish a permanent presence on our closest celestial neighbor. The launch of Artemis I occurred on Wednesday, Nov. 16 at 1:47 AM EST (06:47 UTC). Should teams have required additional…
-

Artemis I releases 10 cubesats, including a Moon lander, for technology and research
The Artemis I mission, the first flight of the Orion spacecraft and SLS, is now underway after a successful launch from Pad 39B at the Kennedy Space Center at 1:47:44 AM EST (06:47:44 UTC) on Nov. 16. Artemis I not only launched the Orion spacecraft to the Moon but also 10 6U CubeSats, most massing…
-

NASA teams take SLS through fueling test to inform launch date
As part of continued troubleshooting and seal replacement validation efforts, teams at the Kennedy Space Center in Florida took the SLS rocket through a Core Stage and Interim Cryogenic Propulsion System (ICPS) fueling test on Wednesday, Sept. 21. NASA officials hoped the test would reveal no leaks of the liquid hydrogen (LH2) system, which has…
-

SLS teams scrub second launch attempt for Artemis I as hydrogen leaks persist
NASA has scrubbed the second launch attempt of the Artemis I mission from the Kennedy Space Center in Florida after a liquid hydrogen (LH2) leak was detected at the vehicle-to-ground interface on the LH2 Tail Service Mast Umbilical (TSMU). This was the fourth time teams loaded liquid hydrogen on the vehicle, and the fourth time…
-

Aiming for the Moon: Artemis I countdown begins for historic flight
The launch countdown for the Space Launch System (SLS) rocket and the Artemis I mission is underway at the Kennedy Space Center in Florida ahead of a planned liftoff within a two-hour launch window that opens at 8:33 AM EDT (12:33 UTC) on Monday, August 29. The launch count comes after more than a decade…
-

SLS arrives at LC-39B for launch, teams prepare for multiple launch trajectories
NASA’s Space Launch System (SLS) rocket has left the Vehicle Assembly Building at the Kennedy Space Center in Florida and completed its 4.2-mile (6.7-km) journey to Launch Complex 39B. The multi-hour rollout process resulted in a sunrise arrival at the pad. The rollout is the last major milestone ahead of launch, which will differ from…
-

Artemis 1 launch team overcomes obstacles to complete WDR test objectives
NASA’s Exploration Ground Systems (EGS) program and prime launch processing contractor Jacobs completed the Wet Dress Rehearsal (WDR) countdown demonstration test for Artemis 1 at the Kennedy Space Center (KSC) on June 20. The fourth run of the test “cut off” at T-29 seconds, several seconds before the desired stop time but after demonstrating the…