Tag: EM-1
-

NASA’s realigning dual Mobile Launcher plan targets extra SLS Block 1 missions
Space Launch System (SLS) managers are now planning for the utilization of two Mobile Launchers (MLs), allowing for additional use of the rocket on both crewed and cargo-only missions. The first major cargo-only flight is being focused on the Europa Clipper mission now set to ride on a Block 1 SLS, a variant which may…
-

EM-1 Update: Making progress, but still behind schedule
Top NASA human exploration administrators briefed the Human Exploration Operations (HEO) committee of the NASA Advisory Council (NAC) on March 26, providing an update on development, testing, and preparations for the first integrated flight of the Orion crew spacecraft and the Space Launch System (SLS) rocket. Exploration Mission-1 (EM-1) is currently expected to launch in…
-

MAF simulating SLS engine installation with RS-25 pathfinder
Engineers at the Michoud Assembly Facility (MAF) in New Orleans are using a pathfinder RS-25 engine to practice the installation of engines on the Core Stage of the Space Launch System (SLS). Each core will receive four RS-25s, which are currently undergoing test firings at the Stennis Space Center, ahead of a path that will see…
-

Orion spacecraft enjoying calmer seas ahead of All-Hands review
Preparations involving the Exploration Mission -1 (EM-1) Orion are enjoying a relatively trouble-free processing flow at the Kennedy Space Center (KSC). Milestones are being reached on all of the crew module elements, ahead of an All-Hands review that will take place in both the US and Italy. The only issue reported of late related to bracket…
-

Crew Access Arm arrives as SLS Mobile Launcher takes shape
The huge Mobile Launcher (ML) for the Space Launch System (SLS) is gaining more of its array of appendages as it prepares to host the Exploration Mission -1 (EM-1) launch. Although this first SLS mission won’t involve astronauts, the Crew Access Arm (CAA) is making its journey on the back of a large transporter to…
-

Crew Access Arm arrives as SLS Mobile Launcher takes shape
The huge Mobile Launcher (ML) for the Space Launch System (SLS) is gaining more of its array of appendages as it prepares to host the Exploration Mission -1 (EM-1) launch. Although this first SLS mission won’t involve astronauts, the Crew Access Arm (CAA) is making its journey on the back of a large transporter to…
-

SLS EM-1 & -2 launch dates realign; EM-3 gains notional mission outline
Following a series of issues over the last year with the Core Stage for the first flight of the Space Launch System rocket, the launch dates for both the EM-1 and EM-2 flights are beginning to align, with EM-1 now targeting No Earlier Than 15 December 2019 and EM-2 following on 1 June 2022. Additionally,…
-

Preparing the adaptor – LVSA readies for SLS debut
NASA is getting ready to apply spray-on foam insulation (SOFI) to the outside of the Launch Vehicle Stage Adapter (LVSA) that will fly as a part of the Space Launch System (SLS) launch vehicle on Exploration Mission-1 (EM-1). The LVSA is a roughly thirty feet by thirty feet conical spacer structure that connects the top of…
-

Orion ESM begins hot fire testing at White Sands
The Orion European Service Module (ESM) Propulsion Qualification Module (PQM) is in the opening phases of testing – including hot firings – at the White Sands Test Facility in New Mexico. Bolted to a test stand, the PQM is being taken through a series of test campaigns by a team of personnel from prime contractor…
-

Orion ESM begins hot fire testing at White Sands
The Orion European Service Module (ESM) Propulsion Qualification Module (PQM) is in the opening phases of testing – including hot firings – at the White Sands Test Facility in New Mexico. Bolted to a test stand, the PQM is being taken through a series of test campaigns by a team of personnel from prime contractor…