Tag: Jared Isaacman
-

NASA Names Four-Astronaut Crew for Artemis III Docking Mission with SpaceX and Blue Origin Landers
NASA has selected three American astronauts and one European astronaut to fly on Artemis III, a landmark mission scheduled for late 2027 that will conduct the first in-space docking demonstrations between NASA’s Orion spacecraft and lunar landers developed by SpaceX and Blue Origin. NASA Administrator Jared Isaacman announced the crew during a ceremony in Houston…
-

NASA Plans Headquarters Relocation as Agency Reorganization Moves Forward
NASA is preparing to relocate its headquarters as part of a broader organizational restructuring effort, with agency officials aiming to identify a new location by the end of 2026. The move comes as the lease on NASA’s current headquarters complex in Washington, D.C., is scheduled to expire in 2028. The agency has occupied the leased…
-

Blue Origin Targets New Glenn Return to Flight Before End of 2026 After Launch Pad Explosion
Blue Origin plans to return its New Glenn rocket to flight before the end of 2026 despite an explosion last week that generated shockwaves reportedly comparable to a small earthquake and caused damage at the company’s launch complex. Following an assessment of Launch Complex 36A and surrounding infrastructure, Blue Origin Chief Executive Officer Dave Limp…
-

Blue Origin vows to resume New Glenn flights by year’s end
An aerial view of launch complex 36 at the Cape Canaveral Space Force Station showing the aftermath of the New Glenn explosion last Thursday. The rocket itself virtually disintegrated in the blast leaving its transporter-erector in wreckage on the concrete pad’s surface. The large gantry suffered structural damage near its base while the mangled remains…
-

Preview: NASA updates progress towards established a Moon Base, Artemis 3 mission
NASA plans to build a planned moon base in three stages, starting with more frequent astronaut and cargo flights to the moon the develop the infrastructure needed to support long-duration crews. Image: NASA TV Nearly two months after first unveiling its big plans to establish a Moon Base at the lunar south pole, NASA leadership…
-

SpaceX Launches Starship V3 in Major Test Flight Ahead of Planned IPO
SpaceX has launched its new Starship V3 rocket in a high-profile test flight from Texas after an earlier launch attempt was postponed because of a launch-tower malfunction. The uncrewed rocket lifted off shortly after 17:30 local time on Friday, marking the first flight of the latest Starship configuration, which stands approximately 124 meters tall. According…
-

This is my third Orion launch, but it feels totally different
KENNEDY SPACE CENTER, Fla.—This will be the third time I have observed NASA’s Orion spacecraft take flight. But with this one, for the first time, am I genuinely hopeful about the future of the space agency and its plans to build a station on the surface of the Moon. The two previous flights, in 2014…
-

NASA outlines ambitious $20 billion plan for moon base
NASA Administrator Jared Isaacman speaks during an event where NASA is outlining how the agency is executing President Donald J. Trump’s National Space Policy and accelerating preparations for America’s return to the surface of the Moon by 2028, Tuesday, March 24, 2026, at the Mary W. Jackson NASA Headquarters building in Washington. During the event…
-

NASA Administrator teases further Artemis program updates in one-on-one interview
NASA Administrator Jared Isaacman (right) speaks with Spaceflight Now Reporter Will Robinson-Smith (left) at NASA’s Kennedy Space Center to discuss the Artemis program and other agency initiatives. Image: John Pisani/Spaceflight Now NASA has it’s sights set on launching the Artemis 2 mission no earlier than April 1. The determination came following the conclusion of a…
-

NASA Selects ULA’s Centaur 5 as Upper Stage for SLS Starting With Artemis 4
NASA has selected United Launch Alliance’s Centaur 5 upper stage for use on its Space Launch System (SLS) rocket beginning with the Artemis 4 mission, currently scheduled to launch no earlier than early 2028, according to contract documents released by the agency. Centaur 5 was originally developed as the upper stage for United Launch Alliance’s…