Tag: Orion
-

NASA completes umbilical test for SLS Artemis 1 mission
NASA’s Space Launch System (SLS) rocket completed another milestone on its way to launch with the Umbilical Release and Retract Test (URRT). The URRT was performed on the rocket on September 19 while it stood in High Bay 3 of the Vehicle Assembly Building (VAB). During the test, the swing arms and T0 umbilicals at…
-

SLS engineering tests to accompany pre-launch checkouts for Artemis 1
The launch campaign for NASA’s Artemis 1 test flight will be punctuated by critical and unique tests to support both pre-launch checkouts of this first-flight vehicle and long-term design objectives. Launch preparations are progressing towards the first power-up of the Artemis 1 Space Launch System (SLS) rocket, which will allow the Exploration Ground Systems (EGS)…
-

NASA evaluating schedule, launch date forecasts for Artemis 2
NASA is currently forecasting that Artemis 2 will be ready to launch no earlier than (NET) September 2023, but similar to attempting to forecast when Artemis 1 will be ready to launch, there is also uncertainty in when Artemis 2 might fly. The second joint test flight of NASA’s Orion and Space Launch System (SLS)…
-

NASA EGS, Jacobs preparing SLS Core Stage for Artemis 1 stacking
The Core Stage of NASA’s first Space Launch System (SLS) vehicle arrived at the Kennedy Space Center (KSC) and was moved into the Vehicle Assembly Building (VAB) on April 29. The stage is now in the hands of KSC’s Exploration Ground System (EGS) program and prime test operations and support contractor (TOSC) Jacobs. The long-awaited…
-

Ten month schedule to ready SLS for Artemis 1 launch after Core Stage arrives at KSC
NASA’s Exploration Ground Systems (EGS) program is looking at a wide range of forecasts for when they can complete testing necessary to be ready to launch Artemis 1. The Core Stage of NASA’s first Space Launch System (SLS) vehicle arrived at the Kennedy Space Center and was moved into the Vehicle Assembly Building (VAB) on…
-

NASA SLS Green Run testing complete, Boeing readies Core Stage for tow to Florida
NASA’s Space Launch System (SLS) program and prime Core Stage contractor Boeing wrapped up the Green Run testing campaign on the Artemis 1 flight article at the Stennis Space Center and are readying the vehicle for its long-awaited shipment to the Kennedy Space Center (KSC) in Florida. After reviewing the performance of the vehicle from…
-

Following troubled childhood, Orion trio preparing for flight
Once the troublesome element of the Constellation (now Artemis) Program, three Orion spacecraft are in various stages of preparation for flight, two of which now already reside at their Kennedy Space Center launch site. With the Artemis 3 Orion – set to depart Earth with the crew that will step foot on the surface of…
-

EGS synchronizing Artemis 1 Orion, SLS Booster preps with Core Stage schedule
NASA’s Exploration Ground Systems (EGS) program and prime test and operations contractor (TOSC) Jacobs are working at the Kennedy Space Center (KSC) to position Artemis 1 Orion and Space Launch System (SLS) hardware to be ready for final assembly ahead of the arrival of the SLS Core Stage in the late-April time-frame. With the final…
-

Canada to become second nation ever to send people to the Moon
To date, only Americans have travelled to the Moon. On Artemis 2, that will change when the Canadian Space Agency sends one of its four astronauts on the first-ever crewed flight of NASA’s Orion capsule and the Space Launch System (SLS) rocket on a near two week test flight around the Moon. The as yet…
-

New Artemis 1 schedule uncertainty as NASA EGS ready to continue SLS Booster stacking
The NASA Exploration Ground Systems (EGS) program at Kennedy Space Center (KSC) in Florida is prepared to continue integration of the vehicle for the Artemis 1 lunar mission, but space agency and contractor management for the EGS, Orion, and Space Launch System (SLS) programs are monitoring the status of hardware elements that will be needed…