Tag: SLS
-

SLS Program hit by Hurricane Zeta while working through Green Run issues
The law of averages caught up to the New Orleans area and the two NASA facilities located nearby when Hurricane Zeta roared directly through them on the evening of October 28 as a Category Two storm. Several tropical weather systems had spared the Michoud Assembly Facility (MAF) in New Orleans East and the Stennis Space…
-

SLS Core Stage nearing home stretch for Green Run tanking test
Final preparations are in work to ready the first Space Launch System (SLS) Core Stage flight article for its first-ever propellant loading in the B-2 Test Stand at NASA’s Stennis Space Center in Southern Mississippi. Prime contractor Boeing is leading the Green Run test campaign for the central component of the space agency’s new launch…
-

Boeing, NASA return to SLS Green Run test preps after latest hurricane interruption
After taking precautions against a fifth approaching hurricane, the Space Launch System (SLS) Green Run test team is back on site in the B-2 Test Stand at NASA’s Stennis Space Center in Mississippi to continue preparations for the final two critical tests of the year-long campaign on the first Core Stage. Prime contractor Boeing is conducting…
-

ASAP urges NASA to build cross-program computer test capability for Artemis
The Aerospace Safety Advisory Panel (ASAP) expressed its concern about the integrated computer testing capabilities across the three separate programs under the Exploration Systems Development (ESD) division of NASA’s Human Exploration and Operations Mission Directorate. The Exploration Ground Systems (EGS), Orion, and Space Launch System (SLS) programs under ESD are working together to accomplish upcoming…
-

ASAP urges NASA to build cross-program computer test capability for Artemis
The Aerospace Safety Advisory Panel (ASAP) expressed its concern about the integrated computer testing capabilities across the three separate programs under the Exploration Systems Development (ESD) division of NASA’s Human Exploration and Operations Mission Directorate. The Exploration Ground Systems (EGS), Orion, and Space Launch System (SLS) programs under ESD are working together to accomplish upcoming…
-

EGS Integration Console in the middle of Artemis 1 countdown deliberations
The NASA and Jacobs engineers staffing the Integration Console will be literally and figuratively in the center of the final discussions to clear the Orion/Space Launch System (SLS) vehicle for its inaugural Artemis 1 launch. Sitting in the middle of the main Firing Room at the Kennedy Space Center (KSC), Exploration Ground Systems (EGS) Launch…
-

Aerojet Rocketdyne getting Shuttle engines ready for SLS Core Stage Green Run support
Four veteran Space Shuttle Main Engines will benchmark the performance of the rookie Space Launch System (SLS) Core Stage in the final two critical tests of NASA’s Green Run campaign. After loading the stage with propellant for the first time and demonstrating in a countdown that it can satisfy engine start criteria, the final test…
-

NASA, Northrop Grumman complete first SLS Flight Support Booster test
Northrop Grumman’s Propulsion Systems Division has completed the first of a series of Flight Support Booster (FSB) tests of the NASA Space Launch System’s solid rocket motors, a series that will last as long as the SLS program exists. The FSB-1 booster will help NASA and Northrop Grumman evaluate new materials for use in future…
-

SLS Green Run test-firing to verify Core Stage design, analysis before first launch
The Green Run test campaign for NASA’s first Space Launch System (SLS) Core Stage will culminate in two critical tests that will demonstrate the real-world performance of the large, complicated vehicle. The last two of the eight test cases of the campaign at the Stennis Space Center in Mississippi will finally load the stage with…
-

SLS Green Run test-firing to verify Core Stage design, analysis before first launch
The Green Run test campaign for NASA’s first Space Launch System (SLS) Core Stage will culminate in two critical tests that will demonstrate the real-world performance of the large, complicated vehicle. The last two of the eight test cases of the campaign at the Stennis Space Center in Mississippi will finally load the stage with…