Tag: SLS
-

SSME family prepare for SLS core stage role following Shuttle success
NASA’s 15 Space Shuttle Main Engines (SSMEs) are being transported to the Stennis Space Center (SSC), as they transition towards their future role with the Space Launch System (SLS). The highly reliable RS-25Ds – nine of which flew with the last three Space Shuttle missions – will eventually be succeeded by the expendable RS-25E, early…
-

SLS capability touted for Europa Lander capability, Enceladus sample return
As the Space Launch System (SLS) teams head into their first full year since the vehicle was finally announced, fascinating – albeit well into the future – Exploration Systems Development (ESD) Design Reference Mission (DRM) options for deep space have been outlined in the SLS Concept Of Operations (Con Ops), options which include ambitious missions…
-

KSC renovation work continuing ahead of future 21st Century spaceport role
The Kennedy Space Center is undergoing improvements to its buildings and infrastructure, work which will continue at the spaceport through to 2013. Most of the work is taking place on the 50 year old waterway, which links the Turn Basin to the crawlerway through to both Pad 39A and 39B – the latter of which…
-

Next Gen Shuttle-Capable vehicle interest as secret effort to save orbiters ends
For the past several months, a plan to restart shuttle operations – funded by billions of dollars of secured non-government investment – was under evaluation with NASA and shuttle contractors prior to the secret effort ending last week. However, the group behind the effort have now switched their focus to a “Next Generation, Shuttle Capable” vehicle…
-

Building the Roadmap for SLS – Con Ops lays out the LEO/Lunar Options
With evaluations continuing into NASA’s future crewed exploration aspirations, the foundations behind what should be a definitive roadmap – otherwise known as Exploration Systems Development (ESD) Design Reference Missions (DRM) – are starting to come to light, as outlined in the Space Launch System (SLS) Concept Of Operations (Con Ops) document. SLS Mission Ability –…
-

“Asteroid Next” missions: Proving Grounds for future crewed Mars missions
As NASA continues to define and plan for the future of human space exploration of the solar system beyond Low Earth Orbit, the Human Space Exploration Community’s Workshop on the GER – in cooperation with NASA – has outlined the potential path the U.S. space agency will follow in the build up to eventual crewed…
-

Exploration Gateway Platform hosting Reusable Lunar Lander proposed
In a potential marriage of the Space Launch System (SLS) with a central exploration plan, a Boeing-authored presentation has proposed an Exploration Gateway Platform architecture that not only returns man to the lunar surface – via the use of only one SLS launch to a reusable Lunar Lander – but provides a baseline for pathfinders…
-

SLS aims to launch a week after rollout – ML rolls back to Park Site
The recently produced Concept of Operations (Con Ops) documentation has revealed the Space Launch System (SLS) will be ready to launch within a week of rollout, around a third of the average pad flow time required for the Space Shuttle. Meanwhile, the SLS Mobile Launcher (ML) has been transported back off Pad 39B following numerous…
-

Mobile Launcher trip to Pad 39B providing opening tests for SLS Con Ops
The Space Launch System (SLS) Mobile Launcher (ML) has completed its debut trip to Pad 39B, following a steady journey atop of the Crawler Transporter (CT). While a large amount of testing will be carried out at the pad, the trip down the crawlerway provides engineers with vital data, which can be feed into the…
-

SLS J-2X Upper Stage engine enjoys successful 500 second test fire
In a full 500 second test firing, the J-2X engine – a key part of the evolved Space Launch System (SLS) – has been put through its paces at NASA’s Stennis Space Center (SSC). Up to three of the powerful engines will power the Upper Stage of the Heavy Lift Launch Vehicle (HLV), in configurations…