News
-

GUCP troubleshooting continues as MMT push for launch on June 17
Read more →: GUCP troubleshooting continues as MMT push for launch on June 17In a similar event to STS-119’s scrub, Endeavour’s launch has been delayed due to a significant leak registered…
-

STS-127: Ice in focus as RSS retracts – GUCP leak, launch scrubbed
Read more →: STS-127: Ice in focus as RSS retracts – GUCP leak, launch scrubbedThe ascent threat of ice liberation, as observed on STS-126 and potentially STS-125, will be closely monitored during…
-

Endeavour enjoying a smooth countdown heading into L-2 MMT milestone
Read more →: Endeavour enjoying a smooth countdown heading into L-2 MMT milestoneSTS-127 is on track for a Saturday launch, with no issues of note being worked on the vehicle.…
-

Supporting Endeavour: OPO check previous flights to ensure STS-127 safety
Read more →: Supporting Endeavour: OPO check previous flights to ensure STS-127 safetyWith Endeavour’s June 13 launch to the ISS now counting down, engineers are continuing to work towards the safe…
-

STS-127 crew land at KSC as engineers push towards June 13 target
Read more →: STS-127 crew land at KSC as engineers push towards June 13 targetThe STS-127 crew – led by Commander Mark Polansky – have arrived at the Kennedy Space Center (KSC),…
-

Ares I-X slips to September 18 as processing edges towards stacking
Read more →: Ares I-X slips to September 18 as processing edges towards stackingThe Ares I-X test vehicle is scheduled to begin stacking in the Vehicle Assembly Building (VAB) at the…
-

STS-127 FRR Outlines Engine and Flight Operations Changes for JAXA Mission
Read more →: STS-127 FRR Outlines Engine and Flight Operations Changes for JAXA MissionWith final launch processing underway on Shuttle Endeavour at Launch Pad-A, NASA managers have outlined several changes to…
-

Atlantis returns to OPF for STS-129 processing – Endeavour SSME contamination
Read more →: Atlantis returns to OPF for STS-129 processing – Endeavour SSME contaminationAtlantis has returned to Orbiter Processing Facility (OPF-1) in preparation for her flow towards the STS-129 mission to…
-

STS-127 heads toward June 13 – SRB modifications identified during SSP FRR
Read more →: STS-127 heads toward June 13 – SRB modifications identified during SSP FRRNASA officials have cleared Space Shuttle Endeavour for launch on June 13 at 7:17a.m. This mission, the STS-127/2J/A…
-

Atlantis arrives back at KSC ahead of STS-127 Agency FRR
Read more →: Atlantis arrives back at KSC ahead of STS-127 Agency FRRAtlantis is finally home after a cross-country trip on top of a Shuttle Carrier Aircraft (SCA) and will…
-

Atlantis due back at KSC Tuesday – STS-125 ET foam liberation event reviewed
Read more →: Atlantis due back at KSC Tuesday – STS-125 ET foam liberation event reviewedAtlantis’ piggyback ride back to the Kennedy Space Center (KSC) is expected to come to a conclusion between…
-

Endeavour arrives at Pad 39A – Atlantis heading to Biggs, Texas on Monday
Read more →: Endeavour arrives at Pad 39A – Atlantis heading to Biggs, Texas on MondayThe high tempo pace of shuttle processing continues through the weekend and earlier into next week, with Atlantis’…