News
-

STS-126 launch countdown begins – Atlantis heads back to OPF-1
Read more →: STS-126 launch countdown begins – Atlantis heads back to OPF-1The three day launch countdown for STS-126 has begun, marking the start of S0007 operations – which will…
-

ISS prepares for arrival of STS-126 – STS-119 launch date advancement debate
Read more →: ISS prepares for arrival of STS-126 – STS-119 launch date advancement debateWith STS-126 closing in on the start of S0007 – otherwise known as the three day launch countdown…
-

STS-126 to debut SRB modification to gather Ares I Thrust Oscillation data
Read more →: STS-126 to debut SRB modification to gather Ares I Thrust Oscillation dataSTS-126 will see the flight debut of two new sets of instrumentation, aimed at gathering more detailed data…
-

IFA lessons learned aid STS-126’s upcoming mission safety
Read more →: IFA lessons learned aid STS-126’s upcoming mission safetyAs Endeavour heads into the home stretch of pad processing before her scheduled launch on November 14, technicians…
-

NASA realign five 2009 missions – Ares I-X likely heading to Oct, 09
Read more →: NASA realign five 2009 missions – Ares I-X likely heading to Oct, 09The Space Shuttle Program (SSP) have concluded their manifest meeting by realigning the 2009 shuttle schedule. The preliminary…
-

China puts two satellites into orbit
Read more →: China puts two satellites into orbitA Long March 2D carrier rocket carrying Chuangxin 1-02 and Shiyan Satellite 3 blasts off from the…
-

China up the pace with another dual launch
Read more →: China up the pace with another dual launchChina has launched its eighth orbital mission this year, orbiting two satellites via a CZ-2D Chang Zheng-2D (CZ2D-9)…
-

ILS Proton M launches with ASTRA IM for long trip to orbit
Read more →: ILS Proton M launches with ASTRA IM for long trip to orbitInternational Launch Services (ILS) have launched a Russian Proton M launch vehicle from Pad 39 at Baikonur Cosmodrome, Kazakhstan, at…
-

STS-126 working Display Processor issue – STS-125 de-stack preps
Read more →: STS-126 working Display Processor issue – STS-125 de-stack prepsEngineers are working a connection issue with an Integrated Display Processor on Endeavour, which is currently a constraint…
-

Ares I Lift Off Drift Curve focuses on the TVC – not just high winds
Read more →: Ares I Lift Off Drift Curve focuses on the TVC – not just high windsDocumentation related to Ares I’s Lift Off Drift Curve issue has highlighted concerns with the vehicle’s Thrust Vector…
-

Safety enhancements dominate STS-126 Flight Readiness Reviews
Read more →: Safety enhancements dominate STS-126 Flight Readiness ReviewsAs Space Shuttle Endeavour continues to enjoy a smooth processing flow at pad 39A, Space Shuttle Program (SSP)…
-

Atlantis de-stack plan – as STS-125 is delayed to May
Read more →: Atlantis de-stack plan – as STS-125 is delayed to MayUnited Space Alliance engineers are working a tentative plan to de-stack Atlantis, pending official confirmation from the Space…