Tag: Astrobotic
-

Voyager Wins $298M NASA Contract After Astrobotic Deal
Does Voyager’s $298M NASA Contract Validate the Astrobotic Acquisition? $298 million. That single NASA task order — awarded June 30, 2026, and announced publicly alongside the close of Voyager Technologies’ acquisition of Astrobotic Technology — may be the clearest signal yet that the Commercial Lunar Payload Services (CLPS) pipeline is maturing into a real, recurring…
-

Astrobotic showcases Griffin-1 lander ahead of environmental testing in California
Technicians work on Astrobotic’s Griffin-1 lander inside a cleanroom at the company’s facility in Pittsburgh, Pennsylvania on Monday, June 15, 2026. Image: Will Robinson-Smith/Spaceflight Now Astrobotic showed off its nearly completed lunar lander, named Griffin-1, as the vehicle prepares to head to NASA’s Jet Propulsion Laboratory in California for environmental testing later this month. The…
-

Thales Alenia Space Awards Astrobotic Contract For Wheels Of Lunar Habitat Module
Space manufacturer Thales Alenia Space has awarded a contract to U.S. robotics company Astrobotic to develop specialized wheels for a mobile lunar habitat under development for the Italian Space Agency (ASI). The wheels will be used on the Multi-Purpose Habitation Module, a concept designed to support human missions on the Moon as part of the…
-

Astrobotic to Supply Wheels for Italy’s Driveable Lunar Habitat
Astrobotic has been selected to build the wheels for a driveable lunar habitat planned by the Italian Space Agency, the company announced on Friday. The Pittsburgh-based firm secured a contract of undisclosed value from Thales Alenia Space to contribute wheel systems for Italy’s Multi-Purpose Habitation (MPH) lunar project. Astrobotic said the wheels will be designed…
-

Astrobotic delays Griffin-1 Moon mission to NET July 2026
Astrobotic staff examine a propulsion tank sitting in front of Griffin-1’s structure. Image: Astrobotic Astrobotic is now eyeing the summer of 2026 for the launch of its second mission with the goal of landing on the surface of the Moon. On Friday, the company based in Pittsburgh, Pennsylvania, said it was targeting a launch window…
-

Astrobotic clears wireless charging system for moon missions with help from WiBotic
A CubeRover with a wireless charging node drives up to a second power node to charge. (Astrobotic Photo) Astrobotic says it has completed flight model acceptance testing for a wireless charging system that incorporates technology from Seattle-based WiBotic — and that could help rovers roam across the surface of the moon. The system is designed…
-

After a wrenching decision by NASA, private lunar lander finds a new customer
Last year was not a good one for a lunar lander company based in Pittsburgh named Astrobotic. In January, the company’s first spacecraft finally launched after years of delays, carrying dozens of payloads, scientific instruments, and time capsules. But within hours of launch, the Peregrine spacecraft developed a propellant leak in its propulsion system. Although…
-

Astrobotic’s lander didn’t make it to the Moon because of a failed valve
Seven months after its first lunar lander fell short of reaching the Moon, Astrobotic announced Tuesday that the spacecraft was stricken by a valve failure that caused a propellant tank to burst in orbit. The company’s next landing attempt, using a much larger spacecraft, will include fixes to prevent a similar failure. Astrobotic’s first Peregrine…
-

NASA built a Moon rover but can’t afford to get it to the launch pad
NASA has spent $450 million designing and building a first-of-its-kind robot to drive into eternally dark craters at the Moon’s south pole, but the agency announced Wednesday it will cancel the rover due to delays and cost overruns. “NASA intends to discontinue the VIPER mission,” said Nicky Fox, head of the agency’s science mission directorate.…
-

Rocket Report: Starship could fly again in May; Ariane 6 coming together
Welcome to Edition 6.36 of the Rocket Report! SpaceX wants to launch the next Starship test flight as soon as early May, the company’s president and chief operating officer said this week. The third Starship test flight last week went well enough that the Federal Aviation Administration—yes, the FAA, the target of many SpaceX fans’…